{"id":1321,"date":"2019-07-02T13:16:03","date_gmt":"2019-07-02T12:16:03","guid":{"rendered":"http:\/\/www.furnessrailwaytrust.org.uk\/about\/blog\/?p=1321"},"modified":"2019-07-02T13:16:03","modified_gmt":"2019-07-02T12:16:03","slug":"monday-2nd-july-2019","status":"publish","type":"post","link":"https:\/\/furnessrailway.co.uk\/about\/?p=1321","title":{"rendered":"Monday 2nd July 2019"},"content":{"rendered":"<p>We start this week&#8217;s blog with a couple of FRT projects which are being undertaken in the RSR&#8217;s workshop.<\/p>\n<p>Alan Preston and Jim Hanmer have been busy overhauling <em>Fluff<\/em>&#8216;s engine.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1316\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_102012-1024x576.jpg\" alt=\"Fluff's pistons in the component wash bath\" width=\"840\" height=\"473\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_102012-1024x576.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_102012-300x169.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_102012-768x432.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_102012-1200x675.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>All the pistons have been removed from the liners and given a good soaking in the component wash bath. It is hoped that this process will release the piston rings which, like everything else on <em>Fluff<\/em> it seems, have seized.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1317\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_102033A-576x1024.jpg\" alt=\"Alan Preston with one of Fluff's piston rods\" width=\"576\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_102033A-576x1024.jpg 576w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_102033A-169x300.jpg 169w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_102033A-768x1365.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_102033A-1200x2133.jpg 1200w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/>Alan is seen here with one of the piston rods.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1314\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_102209-1024x576.jpg\" alt=\"Bill Norcross machining one of the bearings\" width=\"840\" height=\"473\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_102209-1024x576.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_102209-300x169.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_102209-768x432.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_102209-1200x675.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Bill Norcross has been machining out recesses in FR 20&#8217;s tender axle bearings in order that they can receive white metal.<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1315\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_094120A-576x1024.jpg\" alt=\"Bill Norcross with one of the machined bearings\" width=\"576\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_094120A-576x1024.jpg 576w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_094120A-169x300.jpg 169w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_094120A-768x1365.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190626_094120A-1200x2133.jpg 1200w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1323\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/IMG_20190628_153119-768x1024.jpg\" alt=\"Black gloss on FR20's dragbox\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/IMG_20190628_153119-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/IMG_20190628_153119-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/IMG_20190628_153119.jpg 960w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/> Over to the FRT shed where work has continued on cleaning FR 20&#8217;s engine frames, and paint has been applied on Wednesday and Friday by Phil Bell, John Dixon, Roger Benbow and a rare visit on Friday from Neil.<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1322\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/IMG_20190628_153044-768x1024.jpg\" alt=\"Red undercoat on the rear inner frames of FR20\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/IMG_20190628_153044-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/IMG_20190628_153044-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/IMG_20190628_153044.jpg 960w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/p>\n<p>Paul Balshaw and Howard have been working on <em>Fluff<\/em>&#8216;s frames with Phil Bell also turning his hand (excuse the pun) to the handbrake control rod. Outside, John Davis and Keith have been working on <em>Wootton Hall<\/em>&#8216;s new tender tank whilst Tim and Fred have been painting <em>Caliban<\/em>&#8216;s wheelsets. <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1324\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/IMG_20190628_155501-768x1024.jpg\" alt=\"\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/IMG_20190628_155501-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/IMG_20190628_155501-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/IMG_20190628_155501.jpg 960w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>The latter are now turning bright blue with undercoat paint.<\/p>\n<p>Keith has been over to Embsay and reports that a problem with 5643&#8217;s vacuum pump has now been identified and fixed and that the loco should be back in traffic this next weekend.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1318\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190701_104410-1024x576.jpg\" alt=\"10.46 Barrow to Manchester Airport on the first day of the new service\" width=\"840\" height=\"473\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190701_104410-1024x576.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190701_104410-300x169.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190701_104410-768x432.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/07\/20190701_104410-1200x675.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>It would be remiss of us not to refer to the step change in train service that took place yesterday on the former Furness Railway. We show a photo of a brand new Class 195 waiting to be ceremonially waved away from Barrow station to Manchester Airport, one of what has doubled to eleven such weekday services that were introduced as part of the timetable change.<\/p>\n<p>Finally, all members should have received an invitation to the Annual General Meeting on the 16th July. Let us know if you haven&#8217;t. Also, The <em>Iron Horse<\/em> has been proof read and is now back with the printer. Hopefully, they will be sent out in the next week.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We start this week&#8217;s blog with a couple of FRT projects which are being undertaken in the RSR&#8217;s workshop. Alan Preston and Jim Hanmer have been busy overhauling Fluff&#8216;s engine. All the pistons have been removed from the liners and given a good soaking in the component wash bath. It is hoped that this process &hellip; <a href=\"https:\/\/furnessrailway.co.uk\/about\/?p=1321\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Monday 2nd July 2019<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1321","post","type-post","status-publish","format-standard","hentry","category-uncategorised"],"_links":{"self":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/1321","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1321"}],"version-history":[{"count":1,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/1321\/revisions"}],"predecessor-version":[{"id":1325,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/1321\/revisions\/1325"}],"wp:attachment":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1321"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1321"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1321"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}