{"id":1405,"date":"2019-08-28T08:11:38","date_gmt":"2019-08-28T07:11:38","guid":{"rendered":"http:\/\/www.furnessrailwaytrust.org.uk\/about\/blog\/?p=1405"},"modified":"2019-08-28T08:11:38","modified_gmt":"2019-08-28T07:11:38","slug":"monday-26th-august-2019","status":"publish","type":"post","link":"https:\/\/furnessrailway.co.uk\/about\/?p=1405","title":{"rendered":"Monday 26th August 2019"},"content":{"rendered":"<p>A quick Bank Holiday update before settling down on the sofa for the last time with Demelza this evening &#8211; last edition of Poldark for those that don&#8217;t watch it.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1399\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105227-1024x576.jpg\" alt=\"Fred painting FR 20's firebox\" width=\"840\" height=\"473\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105227-1024x576.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105227-300x169.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105227-768x432.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105227-1200x675.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Andy Booth has completed the expansion of the tubes in the FR 20&#8217;s boiler and has been beading them over in the firebox. He will return to complete the job early in September. Meanwhile, Fred has started the job of giving the boiler a coat of paint.<\/p>\n<p>FR 20&#8217;s brake rigging has received a couple of coats of paint and it is planned to reassemble the tender axleboxes shortly ready for the tender to be placed back on its wheels. <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1403\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105538A-576x1024.jpg\" alt=\"Roger on his knees again\" width=\"576\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105538A-576x1024.jpg 576w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105538A-169x300.jpg 169w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105538A-768x1365.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105538A-1200x2133.jpg 1200w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/>Roger has again been on his knees painting the boiler cladding or, as we are assured by John Dixon the correct term is, clothing.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1400\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105420-1024x576.jpg\" alt=\"Machined bearing for Caliban\" width=\"840\" height=\"473\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105420-1024x576.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105420-300x169.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105420-768x432.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105420-1200x675.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Alan Vipond has been machining <em>Caliban<\/em>&#8216;s newly white metalled bearings ready for them to be scraped in.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1401 aligncenter\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190821_165914-AT-A-498x1024.jpg\" alt=\"New spring hanger pin for Caliban\" width=\"498\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190821_165914-AT-A-498x1024.jpg 498w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190821_165914-AT-A-146x300.jpg 146w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190821_165914-AT-A-768x1580.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190821_165914-AT-A-1200x2469.jpg 1200w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190821_165914-AT-A.jpg 1960w\" sizes=\"auto, (max-width: 498px) 100vw, 498px\" \/>Ade, who spent most of last Wednesday shunting carriages, has fitted one of the spring hangers with one of the newly manufactured pins.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-1402 aligncenter\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105602A-576x1024.jpg\" alt=\"JD making new pipe bending vice bench\" width=\"576\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105602A-576x1024.jpg 576w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105602A-169x300.jpg 169w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105602A-768x1365.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105602A-1200x2133.jpg 1200w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/>John Dixon has been making a new bench for a pipe bending vice.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1404 aligncenter\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105627A-576x1024.jpg\" alt=\"Phil Bell and one of Fluff's cab sides\" width=\"576\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105627A-576x1024.jpg 576w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105627A-169x300.jpg 169w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105627A-768x1365.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/08\/20190823_105627A-1200x2133.jpg 1200w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/>And Phil Bell has continued his work on <em>Fluff<\/em>&#8216;s cab platework.<\/p>\n<p>Finally, over at Embsay a hydraulic test has been successfully completed on <em>Cumbria\u00a0<\/em>to test the &#8216;J&#8217; pipe and fireman&#8217;s side injector delivery pipe. A boiler washout was being carried out this last weekend in preparation for the loco&#8217;s boiler survey.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A quick Bank Holiday update before settling down on the sofa for the last time with Demelza this evening &#8211; last edition of Poldark for those that don&#8217;t watch it. Andy Booth has completed the expansion of the tubes in the FR 20&#8217;s boiler and has been beading them over in the firebox. He will &hellip; <a href=\"https:\/\/furnessrailway.co.uk\/about\/?p=1405\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Monday 26th August 2019<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1405","post","type-post","status-publish","format-standard","hentry","category-uncategorised"],"_links":{"self":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/1405","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1405"}],"version-history":[{"count":1,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/1405\/revisions"}],"predecessor-version":[{"id":1406,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/1405\/revisions\/1406"}],"wp:attachment":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1405"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1405"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1405"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}