{"id":1414,"date":"2019-09-02T22:25:19","date_gmt":"2019-09-02T21:25:19","guid":{"rendered":"http:\/\/www.furnessrailwaytrust.org.uk\/about\/blog\/?p=1414"},"modified":"2019-09-02T22:25:19","modified_gmt":"2019-09-02T21:25:19","slug":"monday-2nd-september-2019","status":"publish","type":"post","link":"https:\/\/furnessrailway.co.uk\/about\/?p=1414","title":{"rendered":"Monday 2nd September 2019"},"content":{"rendered":"<p>As we head into the Autumn period there are signs of things starting to come together with some of our projects.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1410\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/20190828_164312A-576x1024.jpg\" alt=\"Axleboxes mounted on FR 20's tender wheels\" width=\"576\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/20190828_164312A-576x1024.jpg 576w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/20190828_164312A-169x300.jpg 169w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/20190828_164312A-768x1365.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/20190828_164312A-1200x2133.jpg 1200w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/>Wednesday saw FR 20&#8217;s tender axleboxes being re-assembled and mounted on the journals. This is in readiness for the arrival of a crane this next Wednesday morning when it is planned to place the tender back on its wheels.<\/p>\n<p>This exercise will not only enable the cleaning down and re-painting of the tender and attention to the brake gear to take place in the coming weeks, but will also allow room in the shed for <em>Caliban<\/em>&#8216;s wheels to be accommodated so that the bearings can be scraped in. Once this is achieved we can look towards lowering <em>Caliban<\/em> back on to its wheels as well. After that it will be the turn of <em>Wootton Hall<\/em>&#8216;s tender wheels to come in for its axlebox bearings to be worked upon.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1411\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/20190828_123112A-576x1024.jpg\" alt=\"Keith silver soldering\" width=\"576\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/20190828_123112A-576x1024.jpg 576w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/20190828_123112A-169x300.jpg 169w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/20190828_123112A-768x1365.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/20190828_123112A-1200x2133.jpg 1200w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/>We include a photo this week of Keith silver soldering a flange on to a piece of <em>Wootton Hall<\/em>&#8216;s injector pipework.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1412 aligncenter\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/IMG_20190830_135148-CA-512x1024.jpg\" alt=\"\" width=\"512\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/IMG_20190830_135148-CA-512x1024.jpg 512w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/IMG_20190830_135148-CA-150x300.jpg 150w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/IMG_20190830_135148-CA-768x1536.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/IMG_20190830_135148-CA-1200x2400.jpg 1200w\" sizes=\"auto, (max-width: 512px) 100vw, 512px\" \/>Over at Embsay there has been significant progress with <em>Cumbria<\/em>. A new regulator gland has been cast and machined following the discovery of a fracture in the old regulator gland. This has now been fitted and packed along with a replacement regulator quadrant.<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1413\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/IMG_20190831_161244-CA-1024x512.jpg\" alt=\"New and old regulator glands for Cumbria\" width=\"840\" height=\"420\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/IMG_20190831_161244-CA-1024x512.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/IMG_20190831_161244-CA-300x150.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/IMG_20190831_161244-CA-768x384.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2019\/09\/IMG_20190831_161244-CA-1200x600.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/><\/p>\n<p>The regulator has been reassembled in the dome after much work to remove side play and to ensure that surfaces are compatible. The hole in the link rod has been opened up to receive a new pin and the main and pilot valves modified to suit. The boiler surveyor will be undertaking the cold inspection of the boiler on Thursday and, subject to a satisfactory report, the boiler will be reassembled for a steam test. Fingers crossed! We are indebted to Charles Adams and Andrew Hirst for their work on <em>Cumbria<\/em> in recent weeks.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As we head into the Autumn period there are signs of things starting to come together with some of our projects. Wednesday saw FR 20&#8217;s tender axleboxes being re-assembled and mounted on the journals. This is in readiness for the arrival of a crane this next Wednesday morning when it is planned to place the &hellip; <a href=\"https:\/\/furnessrailway.co.uk\/about\/?p=1414\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Monday 2nd September 2019<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1414","post","type-post","status-publish","format-standard","hentry","category-uncategorised"],"_links":{"self":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/1414","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1414"}],"version-history":[{"count":1,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/1414\/revisions"}],"predecessor-version":[{"id":1415,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/1414\/revisions\/1415"}],"wp:attachment":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1414"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1414"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1414"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}