{"id":1637,"date":"2020-01-21T11:54:12","date_gmt":"2020-01-21T11:54:12","guid":{"rendered":"http:\/\/www.furnessrailwaytrust.org.uk\/about\/blog\/?p=1637"},"modified":"2020-01-21T11:54:12","modified_gmt":"2020-01-21T11:54:12","slug":"monday-20th-january-2020","status":"publish","type":"post","link":"https:\/\/furnessrailway.co.uk\/about\/?p=1637","title":{"rendered":"Monday 20th January 2020"},"content":{"rendered":"<p>Plenty of photographs this week as our working members get to grips with a variety of projects.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1625\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200115_143856-1024x768.jpg\" alt=\"Phil Bell painting the underside of FR 20's tender\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200115_143856-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200115_143856-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200115_143856-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200115_143856-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Work on FR 20 continued with Alan spending time preparing joints for the boiler blanks. Beneath FR 20&#8217;s tender, Roger and Phil Bell (seen here) have been cleaning and painting the underside of the frames and tank.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1626\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200115_144027-1024x768.jpg\" alt=\"John Dixon prepares a piece of steel prior to forming it into a vacuum pipe bracket\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200115_144027-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200115_144027-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200115_144027-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200115_144027-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>John Dixon has decided to upgrade the brackets which support the vacuum pipe which runs below the engine and the tender. This was put together rather hastily at the beginning of 1999 and is now being brought up to a standard befitting of such a venerable locomotive. John is seen here at work tidying a piece of steel\u00a0 with a file&#8230;.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1627\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_151323A-768x1024.jpg\" alt=\"John Dixon then shapes the steel into a new bracket\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_151323A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_151323A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_151323A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>&#8230;. before bending it into shape with the aid of some heat.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1630\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_103618A-768x1024.jpg\" alt=\"John Davis applies emery cloth to Fluff's journals\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_103618A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_103618A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_103618A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>John Davis has been cleaning up the journals on<em> Fluff<\/em>&#8216;s wheelsets with the aid of some emery cloth.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1631\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_151335-1024x768.jpg\" alt=\"Fred paints one of Fluff's lubrication pots\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_151335-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_151335-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_151335-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_151335-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Fred has been studiously painting\u00a0<em>Fluff<\/em>&#8216;s lubrication oil boxes.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1628\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_124507-1024x768.jpg\" alt=\"John Dixon and Keith Brewer hand shunt Caliban's wheels\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_124507-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_124507-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_124507-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_124507-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Paul and Martin from the Ribble Rail staff helpfully arranged to shunt FR 20&#8217;s boiler out of the heated part of the FRT shed on Friday which allowed <em>Caliban<\/em>&#8216;s wheels to be hand shunted into position in front of the frames. <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1629\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_134703-1024x768.jpg\" alt=\"Caliban's wheels in front of the frames after the shunt\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_134703-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_134703-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_134703-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_134703-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/><em>Caliban<\/em>&#8216;s own boiler on a lowmac was then positioned in front of the wheels so that work on it can commence when resources permit.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1632\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_164218-1024x768.jpg\" alt=\"The new hydraulic lifting table\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_164218-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_164218-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_164218-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200117_164218-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>The newly purchased hydraulic table lift was unpacked and, for once, needed little assembly before being tested in readiness for future use.<\/p>\n<p>There were productive working parties over at Embsay on Thursday and Saturday. Keith, Fred and George attended on Thursday, dismantling and cleaning the areas that the boiler surveyor needed to access. Keith and Fred returned on Saturday to be joined by Mike and Ed.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1633\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05811-1024x576.jpg\" alt=\"Keith Brewer tests for play in 5643 valve\" width=\"840\" height=\"473\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05811-1024x576.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05811-300x169.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05811-768x432.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05811-1200x675.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Keith removed both valve covers in order to assess the play in the valves.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1634\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05817-1024x576.jpg\" alt=\"Ed Tatham polishes 5643's cab roof\" width=\"840\" height=\"473\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05817-1024x576.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05817-300x169.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05817-768x432.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05817-1200x675.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Ed concentrated on cleaning the cab area.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1635\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05819-1024x576.jpg\" alt=\"Fred cleans one of 5643's brass number plates\" width=\"840\" height=\"473\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05819-1024x576.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05819-300x169.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05819-768x432.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05819-1200x675.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Fred polished up the brightwork.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1636\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05823A-MR-576x1024.jpg\" alt=\"Mike Rigg polishes the coupling rods\" width=\"576\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05823A-MR-576x1024.jpg 576w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05823A-MR-169x300.jpg 169w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05823A-MR-768x1365.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/DSC05823A-MR-1200x2133.jpg 1200w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/>Mike gave the coupling rods a good clean.<\/p>\n<p>The boiler surveyor conducted a formal 14 month examination of the boiler today and passed it fit for further use subject to an NDT examination of the bottom of the firebox tubeplate. Arrangements will be made for this to take place as soon as possible. In the meantime, thanks to all those of you who braved the January weather to prepare 5643 for the survey.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Plenty of photographs this week as our working members get to grips with a variety of projects. Work on FR 20 continued with Alan spending time preparing joints for the boiler blanks. Beneath FR 20&#8217;s tender, Roger and Phil Bell (seen here) have been cleaning and painting the underside of the frames and tank. John &hellip; <a href=\"https:\/\/furnessrailway.co.uk\/about\/?p=1637\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Monday 20th January 2020<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1637","post","type-post","status-publish","format-standard","hentry","category-uncategorised"],"_links":{"self":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/1637","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1637"}],"version-history":[{"count":1,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/1637\/revisions"}],"predecessor-version":[{"id":1638,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/1637\/revisions\/1638"}],"wp:attachment":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1637"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1637"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1637"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}