{"id":1646,"date":"2020-01-27T21:07:03","date_gmt":"2020-01-27T21:07:03","guid":{"rendered":"http:\/\/www.furnessrailwaytrust.org.uk\/about\/blog\/?p=1646"},"modified":"2020-01-27T21:07:03","modified_gmt":"2020-01-27T21:07:03","slug":"monday-27th-january-2020","status":"publish","type":"post","link":"https:\/\/furnessrailway.co.uk\/about\/?p=1646","title":{"rendered":"Monday 27th January 2020"},"content":{"rendered":"<p>Just a short update this week. Projects continue to tick along but still with some way to go to the finishing line for any of them!<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1643\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200124_153337-1024x768.jpg\" alt=\"John Dixon painting brackets\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200124_153337-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200124_153337-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200124_153337-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200124_153337-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>John Dixon has continued his quest to up-rate the quality of the vacuum system fixing brackets on FR 20, having now remade all of them from scratch from steel off-cuts. They are now in the process of being painted.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1641\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200124_153312-1024x768.jpg\" alt=\"FR 20's tender changing colour\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200124_153312-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200124_153312-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200124_153312-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200124_153312-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Tim has concentrated his time this week painting FR 20&#8217;s tender, which is now rapidly changing colour.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1639\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200122_144410-1024x768.jpg\" alt=\"Alan removing the brass casting from the top of the dome\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200122_144410-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200122_144410-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200122_144410-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200122_144410-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Alan has continued the task of\u00a0 preparing FR 20&#8217;s boiler for a hydraulic test and is seen here removing the brass safety valve casting from the top of the dome.<\/p>\n<p>Ade has been working on <em>Caliban<\/em>&#8216;s axleboxes and there has been further progress on <em>Fluff<\/em>.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1642\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200124_153410A-768x1024.jpg\" alt=\"Keith preparing the base plate for Wootton Hall's screw reverser for welding\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200124_153410A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200124_153410A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2020\/01\/20200124_153410A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>Keith has been welding up the new pipe which stretches from <em>Wootton Hall<\/em>&#8216;s four cone ejector to the smokebox and he has also been preparing the new screw reverse baseplate for welding by Ian Massey.<\/p>\n<p>Finally, the proof copy of <em>The Iron Horse<\/em>\u00a0magazine has now been read and corrected so the magazines will probably be with us later this week for posting out to members.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Just a short update this week. Projects continue to tick along but still with some way to go to the finishing line for any of them! John Dixon has continued his quest to up-rate the quality of the vacuum system fixing brackets on FR 20, having now remade all of them from scratch from steel &hellip; <a href=\"https:\/\/furnessrailway.co.uk\/about\/?p=1646\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Monday 27th January 2020<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1646","post","type-post","status-publish","format-standard","hentry","category-uncategorised"],"_links":{"self":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/1646","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1646"}],"version-history":[{"count":1,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/1646\/revisions"}],"predecessor-version":[{"id":1647,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/1646\/revisions\/1647"}],"wp:attachment":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1646"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1646"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1646"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}