{"id":2242,"date":"2021-09-13T21:34:18","date_gmt":"2021-09-13T20:34:18","guid":{"rendered":"http:\/\/www.furnessrailwaytrust.org.uk\/about\/blog\/?p=2242"},"modified":"2021-09-13T21:34:18","modified_gmt":"2021-09-13T20:34:18","slug":"monday-13th-september-2021","status":"publish","type":"post","link":"https:\/\/furnessrailway.co.uk\/about\/?p=2242","title":{"rendered":"Monday 13th September 2021"},"content":{"rendered":"<p>As we head into the more comfortable autumn weather, work in the FRT has been progressing well.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2230\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_095823-1024x768.jpg\" alt=\"New and old blower rings for FR 20\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_095823-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_095823-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_095823-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_095823-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>FR 20&#8217;s new blower ring has been fabricated by John Dixon and is seen alongside the old ring which had certainly had its day.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2231\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_101312A-768x1024.jpg\" alt=\"John Dixon drills new holes in the upper side of the new blower ring for FR 20\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_101312A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_101312A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_101312A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>John then set about drilling the new holes which, at 1\/8th&#8221;, are slightly smaller than the previous holes which had opened out naturally beyond their original size.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2233\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210910_151507A-768x1024.jpg\" alt=\"Sam opening out holes in one part of FR 20's steam pipe\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210910_151507A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210910_151507A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210910_151507A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>Alan and Sam have been working on modifying the main steam pipe. Sam is seen opening out the holes in one end of the pipe to accommodate the new studs on the steam chest.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2232\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_115239-1024x768.jpg\" alt=\"Underneath FR 20's tender\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_115239-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_115239-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_115239-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_115239-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Tim has been putting the finishing touches to the paintwork underneath the tender which, along with some new pipework, looks very smart.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2234\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_153500A-1024x718.jpg\" alt=\"Up and away!\" width=\"840\" height=\"589\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_153500A-1024x718.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_153500A-300x210.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_153500A-768x539.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210908_153500A-1200x842.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Ade spent Wednesday raising <em>Caliban<\/em>&#8216;s frames so that the wheels could be rolled underneath (hope the wheels are the right way round, Ade!), and then lowering the frames back down again.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2235\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210911_135022-1024x768.jpg\" alt=\"Caliban's frames after lowering\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210911_135022-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210911_135022-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210911_135022-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210911_135022-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>After some adjustment with the help of a traversing jack, the frames finally came down in the right place, between the wheels.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2238\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210910_131554A-1024x812.jpg\" alt=\"Fluff with left hand side assembled\" width=\"840\" height=\"666\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210910_131554A-1024x812.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210910_131554A-300x238.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210910_131554A-768x609.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210910_131554A-1200x951.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>The left hand side of <em>Fluff<\/em>&#8216;s engine compartment bonnet is now visibly complete.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2239\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210910_112610-1024x768.jpg\" alt=\"John Davis painting an angle for Fluff\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210910_112610-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210910_112610-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210910_112610-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210910_112610-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>John Davis has set about priming an angle to support the right hand side panels.<\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2236\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210910_133636A-768x1024.jpg\" alt=\"Lowering Wootton Hall's tender vacuum cylinder into the tender frames\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210910_133636A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210910_133636A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210910_133636A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>Wootton Hall&#8217;<\/em>s tender vacuum cylinder has been lowered into position.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2237\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210911_134955-1024x768.jpg\" alt=\"Keith Brewer and tender brake shaft\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210911_134955-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210911_134955-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210911_134955-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210911_134955-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Finally, Keith has now manoeuvred the brake shaft adjacent to the cylinder into position ready for fitting.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As we head into the more comfortable autumn weather, work in the FRT has been progressing well. FR 20&#8217;s new blower ring has been fabricated by John Dixon and is seen alongside the old ring which had certainly had its day. John then set about drilling the new holes which, at 1\/8th&#8221;, are slightly smaller &hellip; <a href=\"https:\/\/furnessrailway.co.uk\/about\/?p=2242\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Monday 13th September 2021<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2242","post","type-post","status-publish","format-standard","hentry","category-uncategorised"],"_links":{"self":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2242","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2242"}],"version-history":[{"count":1,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2242\/revisions"}],"predecessor-version":[{"id":2243,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2242\/revisions\/2243"}],"wp:attachment":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2242"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2242"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2242"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}