{"id":2251,"date":"2021-09-20T22:21:09","date_gmt":"2021-09-20T21:21:09","guid":{"rendered":"http:\/\/www.furnessrailwaytrust.org.uk\/about\/blog\/?p=2251"},"modified":"2021-09-20T22:21:09","modified_gmt":"2021-09-20T21:21:09","slug":"monday-20th-september-2021","status":"publish","type":"post","link":"https:\/\/furnessrailway.co.uk\/about\/?p=2251","title":{"rendered":"Monday 20th September 2021"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2245\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_101740A-1024x539.jpg\" alt=\"A sparkling repainted works plate\" width=\"840\" height=\"442\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_101740A-1024x539.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_101740A-300x158.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_101740A-768x404.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_101740A-1200x632.jpg 1200w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_101740A.jpg 1284w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>The final jobs on Furness Railway No. 20 are gradually being knocked off the &#8216;to do&#8217; list. The black paintwork on the works plates has been renewed by Neil and the plates were re-fitted on Wednesday.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2246\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_105219A-768x1024.jpg\" alt=\"Ron Crowe and Paul Balshaw at work on FR 20\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_105219A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_105219A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_105219A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>Ron Crowe refitted the sand pipes while Paul Balshaw gave the loco another clean in readiness for the forthcoming &#8216;volunteer open day&#8217;.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2247\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_113506A-768x1024.jpg\" alt=\"Alan and Sam at work on the main steam pipe in FR20's smokebox\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_113506A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_113506A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_113506A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>Alan and Sam spent quite some time modifying and then fitting the main steam pipe in the smokebox.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2248\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_104117A-768x1024.jpg\" alt=\"John Dixon fits retaining clamps for the water gauge drain pipes\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_104117A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_104117A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_104117A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>John Dixon has made some clamps to retain the boiler water gauge drain pipes in place &#8211; another of those jobs that has taken over twenty years to achieve!<\/p>\n<p>The boiler surveyor is due to give FR 20 what we hope will be a final cold boiler inspection on Tuesday before we light a fire in the firebox. Fingers crossed!<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2249\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_143205-AT-1024x498.jpg\" alt=\"Phil Bell and John Davis at work on Fluff\" width=\"840\" height=\"409\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_143205-AT-1024x498.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_143205-AT-300x146.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_143205-AT-768x373.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210915_143205-AT-1200x583.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Ade caught Phil Bell and John Davis working on the right hand side of Fluff&#8217;s bonnet on Wednesday.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2250\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210918_111318A-768x1024.jpg\" alt=\"Alan and Keith putting together new steelwork for the new water take off box for Wootton Hall's tender\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210918_111318A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210918_111318A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/09\/20210918_111318A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>We had a delivery of newly shaped steel plate on Friday from which Keith is\u00a0going to construct a new water take off box which will sit below Wootton Hall&#8217;s tender tank when completed.<\/p>\n<p>The aforementioned &#8216;volunteer open day&#8217; attracted a number of prospective volunteers on Saturday. Tim and Ade were on hand to show them around plus quite a few other passengers who took the opportunity to visit the FRT shed and purchase some souvenirs. Both Tim and Alison had contributed to a two hour long BBC Radio Lancashire programme on Thursday evening, along with RSR&#8217;s Dave Watkins, Gary Severn and Steve Cain, which highlighted the work of volunteers at the RSR and FRT.<\/p>\n<p>A reminder that the Annual General Meeting will take place next Tuesday evening, 28th September, at 7.30 pm in the FRT shed at Preston. We are informed that there will be cake on hand to tempt members to attend!<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The final jobs on Furness Railway No. 20 are gradually being knocked off the &#8216;to do&#8217; list. The black paintwork on the works plates has been renewed by Neil and the plates were re-fitted on Wednesday. Ron Crowe refitted the sand pipes while Paul Balshaw gave the loco another clean in readiness for the forthcoming &hellip; <a href=\"https:\/\/furnessrailway.co.uk\/about\/?p=2251\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Monday 20th September 2021<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2251","post","type-post","status-publish","format-standard","hentry","category-uncategorised"],"_links":{"self":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2251","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2251"}],"version-history":[{"count":1,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2251\/revisions"}],"predecessor-version":[{"id":2252,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2251\/revisions\/2252"}],"wp:attachment":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2251"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2251"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2251"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}