{"id":2321,"date":"2021-11-01T20:50:13","date_gmt":"2021-11-01T20:50:13","guid":{"rendered":"http:\/\/www.furnessrailwaytrust.org.uk\/about\/blog\/?p=2321"},"modified":"2021-11-01T20:50:13","modified_gmt":"2021-11-01T20:50:13","slug":"monday-1st-november-2021","status":"publish","type":"post","link":"https:\/\/furnessrailway.co.uk\/about\/?p=2321","title":{"rendered":"Monday 1st November 2021"},"content":{"rendered":"<p>After the excitement of seeing FR 20 enter traffic on the 23rd October, it has been back to work in the FRT shed this week.<\/p>\n<p>Further progress has been made with the temporary fitting of boiler cladding sheets to <em>Wootton Hall<\/em>.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2315\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_112617A-768x1024.jpg\" alt=\"Keith warmmng up a handrail stanchion in order to remove it so that boiler cladding can be fitted\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_112617A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_112617A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_112617A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>First, Keith had to remove handrail stanchions to enable the cladding to be fitted. Needless to say, after many years out in the open, the stanchions needed some heat treatment before they could be unscrewed and removed.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2316\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_141427A-768x1024.jpg\" alt=\"Preparing the sheet for lifting\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_141427A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_141427A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_141427A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>Although of fairly thin steel sheet, they are heavier than you would think when it comes to lifting them up on to a locomotive boiler.<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2317\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_141507A-768x1024.jpg\" alt=\"Up goes the steel sheet\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_141507A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_141507A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_141507A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/> The photos show the number of people required for lifting the second of the right hand cladding sheets.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2318\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_154748A-747x1024.jpg\" alt=\"Sam standing by the first two right hand steel sheets fitted\" width=\"747\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_154748A-747x1024.jpg 747w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_154748A-219x300.jpg 219w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_154748A-768x1053.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_154748A-1200x1645.jpg 1200w\" sizes=\"auto, (max-width: 747px) 100vw, 747px\" \/>Sam stands alongside the second fitted sheet.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2319\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_144629A-768x1024.jpg\" alt=\"John Davis painting one of Fluff's rods\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_144629A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_144629A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_144629A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>With the upper superstructure of <em>Fluff<\/em> now virtually complete, Phil and John Davis have been turning their attention to the side rods, which seem to have suffered from the weather on one side. However, after the application of a thin layer of filler applied by Tim, John was soon able to apply a coat of primer.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2320\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_151518A-768x1024.jpg\" alt=\"Roger Benbow examining the fire pump\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_151518A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_151518A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211029_151518A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>Finally, the saga of the fire pump continues with Roger spending some time trying to obtain a spark from the plugs. The pump has been brought into the FRT shed where it is hoped the drier atmosphere will assist the magneto to do its job.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>After the excitement of seeing FR 20 enter traffic on the 23rd October, it has been back to work in the FRT shed this week. Further progress has been made with the temporary fitting of boiler cladding sheets to Wootton Hall. First, Keith had to remove handrail stanchions to enable the cladding to be fitted. &hellip; <a href=\"https:\/\/furnessrailway.co.uk\/about\/?p=2321\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Monday 1st November 2021<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2321","post","type-post","status-publish","format-standard","hentry","category-uncategorised"],"_links":{"self":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2321","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2321"}],"version-history":[{"count":1,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2321\/revisions"}],"predecessor-version":[{"id":2322,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2321\/revisions\/2322"}],"wp:attachment":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2321"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2321"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2321"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}