{"id":2329,"date":"2021-11-08T19:51:23","date_gmt":"2021-11-08T19:51:23","guid":{"rendered":"http:\/\/www.furnessrailwaytrust.org.uk\/about\/blog\/?p=2329"},"modified":"2021-11-08T19:51:23","modified_gmt":"2021-11-08T19:51:23","slug":"monday-8th-november-2021","status":"publish","type":"post","link":"https:\/\/furnessrailway.co.uk\/about\/?p=2329","title":{"rendered":"Monday 8th November 2021"},"content":{"rendered":"<p>A short update this week.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2325\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211105_154706A-771x1024.jpg\" alt=\"Timber packing on Wootton Hall's tender\" width=\"771\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211105_154706A-771x1024.jpg 771w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211105_154706A-226x300.jpg 226w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211105_154706A-768x1019.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211105_154706A-1200x1593.jpg 1200w\" sizes=\"auto, (max-width: 771px) 100vw, 771px\" \/>We are pleased to report further progress with <em>Wootton Hall<\/em> with the wooden packing on the tender frames dovetailed together and all but complete. Once finished it will then be possible to plan lifting the tender tank on to the frames where it can be more easily repaired inside the shed.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2326\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211103_120114AT-1024x498.jpg\" alt=\"Stanlow piped up to Wootton Hall's tender brake cylinder\" width=\"840\" height=\"409\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211103_120114AT-1024x498.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211103_120114AT-300x146.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211103_120114AT-768x373.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211103_120114AT-1200x583.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>The opportunity was taken last Wednesday to test the tender brake cylinder which has been refurbished. The cylinder was taken around to the Ribble Steam Railway running shed where it was connected up to vacuum braked diesel shunter <em>Stanlow<\/em>. Keith and Duncan Sawyer are seen ensuring the connections are correct.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-2327 aligncenter\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211103_122145ATA-498x1024.jpg\" alt=\"The pipework involved in the testing of the vacuum cylinder\" width=\"498\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211103_122145ATA-498x1024.jpg 498w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211103_122145ATA-146x300.jpg 146w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211103_122145ATA-768x1580.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211103_122145ATA-1200x2469.jpg 1200w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211103_122145ATA.jpg 1960w\" sizes=\"auto, (max-width: 498px) 100vw, 498px\" \/>The pipework involved is seen here and it appears that the test was successful.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2328\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/IMG-20211104-WA0004AP.jpg\" alt=\"Live Steam in action on Platform 3 at Lancaster 03.11.21\" width=\"960\" height=\"720\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/IMG-20211104-WA0004AP.jpg 960w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/IMG-20211104-WA0004AP-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/IMG-20211104-WA0004AP-768x576.jpg 768w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/>Last Wednesday also saw our folk group, <em>Live Steam<\/em>, performing on platform 3 at Lancaster station as part of the finale to the Furness Railway 175 celebrations. The lads are seen here sitting down for their lengthy second set of railway songs.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A short update this week. We are pleased to report further progress with Wootton Hall with the wooden packing on the tender frames dovetailed together and all but complete. Once finished it will then be possible to plan lifting the tender tank on to the frames where it can be more easily repaired inside the &hellip; <a href=\"https:\/\/furnessrailway.co.uk\/about\/?p=2329\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Monday 8th November 2021<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2329","post","type-post","status-publish","format-standard","hentry","category-uncategorised"],"_links":{"self":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2329","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2329"}],"version-history":[{"count":1,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2329\/revisions"}],"predecessor-version":[{"id":2330,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2329\/revisions\/2330"}],"wp:attachment":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2329"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2329"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2329"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}