{"id":2345,"date":"2021-11-15T13:27:52","date_gmt":"2021-11-15T13:27:52","guid":{"rendered":"http:\/\/www.furnessrailwaytrust.org.uk\/about\/blog\/?p=2345"},"modified":"2021-11-15T13:27:52","modified_gmt":"2021-11-15T13:27:52","slug":"monday-15th-november-2021","status":"publish","type":"post","link":"https:\/\/furnessrailway.co.uk\/about\/?p=2345","title":{"rendered":"Monday 15th November 2021"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-2336 aligncenter\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211112_144308A-768x1024.jpg\" alt=\"Roger and the fire pump\" width=\"750\" height=\"1000\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211112_144308A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211112_144308A-225x300.jpg 225w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/>At 14.45 on Friday, the peace of the FRT shed was shattered without warning by the earthy roar of a Coventry Climax engine, announcing to all that the three days of work that Roger had expended on the fire pump had been successful. Well done, Roger! We now need to see how the machine copes with washing out a locomotive boiler!<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2337 aligncenter\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_112359-1024x768.jpg\" alt=\"Ed and John Dixon on the magic carpet\" width=\"750\" height=\"563\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_112359-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_112359-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_112359-768x576.jpg 768w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/>There has been further progress on clearing the roof of GER Royal Saloon No. 5 with Ed and John seen here working in tandem on the magic carpet to remove the remaining rain strips and canvas.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2344 size-large aligncenter\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211112_141349-e1636978649805-768x1024.jpg\" alt=\"Fred with two more cleaned up vents for GER 5\" width=\"750\" height=\"1000\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211112_141349-e1636978649805-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211112_141349-e1636978649805-225x300.jpg 225w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/>Fred has once again been cleaning up the torpedo vents &#8211; usually two in a day. Yet more cup wire brushes to order!<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2338 aligncenter\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_111411-1024x768.jpg\" alt=\"Anne and Phil Burton progressing the upholstery on GER 5 in the mess roomi\" width=\"750\" height=\"563\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_111411-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_111411-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_111411-768x576.jpg 768w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/>Anne and Phil Burton have been making steady progress on the upholstery in GER No. 5. They have obtained some cheaper moquette with which to practice on re-covering the cushions.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-2339 size-large\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_161116-e1636978716534-768x1024.jpg\" alt=\"Anne and Phil with the first test cushion\" width=\"750\" height=\"1000\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_161116-e1636978716534-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_161116-e1636978716534-225x300.jpg 225w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/>The finished article looks pretty good. They aim to have one more practice cushion before the selected, rather more expensive, moquette is purchased, which we feel will be more appropriate for a royal saloon.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2340 aligncenter\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_134514A-768x1024.jpg\" alt=\"The third right hand cladding sheet goes on Wootton Hall's boiler\" width=\"750\" height=\"1000\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_134514A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_134514A-225x300.jpg 225w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/>More progress has been made with fitting the cladding on 4979 <em>Wootton Hall&#8217;<\/em>s boiler. It is a team job to get the sheets on top of the boiler as can be seen here.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2341 aligncenter\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211112_153011-1024x768.jpg\" alt=\"Looking better and better\" width=\"750\" height=\"563\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211112_153011-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211112_153011-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211112_153011-768x576.jpg 768w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/>The third sheet on the right hand side has now been fitted.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2342 aligncenter\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_185328AT-636x1024.jpg\" alt=\"Tim pausing from work in Wotton Hall's cab\" width=\"636\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_185328AT-636x1024.jpg 636w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_185328AT-186x300.jpg 186w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_185328AT-768x1236.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_185328AT.jpg 1831w\" sizes=\"auto, (max-width: 636px) 100vw, 636px\" \/>Meanwhile, Tim has been devoting his time recently to tidying up 4979&#8217;s fabricated cab side stanchions with filler so that they look more like Swindon manufactured pressings. The cab sides are also starting to receive attention where they have suffered after having been exposed to 50 years of the elements.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2343 aligncenter\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_154038-1024x768.jpg\" alt=\"Alan reaching down to grab the cotter on FR 20 for one more adjustment!\" width=\"750\" height=\"563\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_154038-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_154038-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2021\/11\/20211110_154038-768x576.jpg 768w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/>Elsewhere, Ade has, amongst other things, been fitting brake blocks to <em>Caliban&#8217;<\/em>s chassis. Alan and Sam have been adjusting the miscreant piston rod cotter on FR 20. Incidentally, there is now video footage available from a cab mounted camera of FR 20&#8217;s first trip in service on the RSR after overhaul:<br \/>\n<iframe loading=\"lazy\" title=\"YouTube video player\" src=\"https:\/\/www.youtube.com\/embed\/Pu5BncI6KFQ\" width=\"560\" height=\"315\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\n","protected":false},"excerpt":{"rendered":"<p>At 14.45 on Friday, the peace of the FRT shed was shattered without warning by the earthy roar of a Coventry Climax engine, announcing to all that the three days of work that Roger had expended on the fire pump had been successful. Well done, Roger! We now need to see how the machine copes &hellip; <a href=\"https:\/\/furnessrailway.co.uk\/about\/?p=2345\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Monday 15th November 2021<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2345","post","type-post","status-publish","format-standard","hentry","category-uncategorised"],"_links":{"self":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2345","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2345"}],"version-history":[{"count":3,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2345\/revisions"}],"predecessor-version":[{"id":2348,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2345\/revisions\/2348"}],"wp:attachment":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2345"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2345"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2345"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}