{"id":2440,"date":"2022-01-24T21:15:59","date_gmt":"2022-01-24T21:15:59","guid":{"rendered":"http:\/\/www.furnessrailwaytrust.org.uk\/about\/blog\/?p=2440"},"modified":"2022-01-24T21:15:59","modified_gmt":"2022-01-24T21:15:59","slug":"monday-24th-january-2022","status":"publish","type":"post","link":"https:\/\/furnessrailway.co.uk\/about\/?p=2440","title":{"rendered":"Monday 24th January 2022"},"content":{"rendered":"<p>Yet another busy week at the workface to report.<\/p>\n<p>Last Tuesday another working party took place at Bury and 5643&#8217;s valves were duly delivered by Keith to the FRT shed on Wednesday morning. It is expected that these will be delivered to Tyseley shortly for new rings to be fitted once the re-bore of the valve liners has taken place at the end of the month.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2427\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220119_104651A-768x1024.jpg\" alt=\"John Dixon repairing the roof of GER 5\" width=\"660\" height=\"880\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220119_104651A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220119_104651A-225x300.jpg 225w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>John Dixon has been undertaking final repairs to the roof of GER Royal Saloon No. 5.<\/p>\n<p>Down below, Tim has been filling and sanding the old, recently plugged, screw holes in the wooden side canvas retaining strips.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2428\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220119_113123A-768x1024.jpg\" alt=\"Phil Bell drilling new screw holes in the wooden roof canvas retaining strips\" width=\"660\" height=\"880\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220119_113123A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220119_113123A-225x300.jpg 225w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>Meanwhile Phil has been busy drilling more screw holes in them!<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2429\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220121_111552A-768x1024.jpg\" alt=\"John Davis cleaning paint off the gas lamp housings\" width=\"660\" height=\"880\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220121_111552A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220121_111552A-225x300.jpg 225w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>John Davis has been cleaning paint off the gas lamp housings.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2430\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220121_111631-1024x768.jpg\" alt=\"Roger cleaning the gas lamp housing rims\" width=\"660\" height=\"495\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220121_111631-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220121_111631-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220121_111631-768x576.jpg 768w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>Roger has been cleaning the gas lamp housing rims.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2438\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220114_115007A-768x1024.jpg\" alt=\"The stripped roof of GER No. 5 ready for painting\" width=\"660\" height=\"880\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220114_115007A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220114_115007A-225x300.jpg 225w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>The roof is now totally stripped and a coat of primer is planned over the coming week.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2434\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220121_115450-1024x768.jpg\" alt=\"Keith cleaning inside Wootton Hall's tender tank\" width=\"660\" height=\"495\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220121_115450-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220121_115450-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220121_115450-768x576.jpg 768w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>The damp inside <em>Wootton Hall&#8217;<\/em>s tender tank has dissipated now that it is situated inside the heated shed. Keith has been cleaning out the inside of the tank in preparation for welding repairs.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2435\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220121_151019-1024x768.jpg\" alt=\"The bottom angle on Wootton Hall's tender tank receiving attention\" width=\"660\" height=\"495\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220121_151019-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220121_151019-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220121_151019-768x576.jpg 768w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>On the outside of the tank. Tim has been cleaning corrosion on the bottom angle of the tank and filling and sanding where necessary.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2436 size-large aligncenter\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220119_142537AT-e1643058862755-498x1024.jpg\" alt=\"One of Caliban's brake blocks which will need machining\" width=\"498\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220119_142537AT-e1643058862755-498x1024.jpg 498w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220119_142537AT-e1643058862755-146x300.jpg 146w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220119_142537AT-e1643058862755-768x1580.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/01\/20220119_142537AT-e1643058862755.jpg 1960w\" sizes=\"auto, (max-width: 498px) 100vw, 498px\" \/>Finally, Ade has been assembling the brake gear on <em>Caliban<\/em> and has found that the brake blocks now need machining to give a good fit following the tyre turning that took place many years ago.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Yet another busy week at the workface to report. Last Tuesday another working party took place at Bury and 5643&#8217;s valves were duly delivered by Keith to the FRT shed on Wednesday morning. It is expected that these will be delivered to Tyseley shortly for new rings to be fitted once the re-bore of the &hellip; <a href=\"https:\/\/furnessrailway.co.uk\/about\/?p=2440\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Monday 24th January 2022<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2440","post","type-post","status-publish","format-standard","hentry","category-uncategorised"],"_links":{"self":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2440","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2440"}],"version-history":[{"count":1,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2440\/revisions"}],"predecessor-version":[{"id":2441,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2440\/revisions\/2441"}],"wp:attachment":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2440"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2440"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2440"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}