{"id":2784,"date":"2022-12-06T21:28:20","date_gmt":"2022-12-06T21:28:20","guid":{"rendered":"http:\/\/www.furnessrailwaytrust.org.uk\/about\/blog\/?p=2784"},"modified":"2022-12-06T21:28:20","modified_gmt":"2022-12-06T21:28:20","slug":"tuesday-6th-december-2022","status":"publish","type":"post","link":"https:\/\/furnessrailway.co.uk\/about\/?p=2784","title":{"rendered":"Tuesday 6th December 2022"},"content":{"rendered":"<p>Here we are, a day late due to Christmas demands on our time, and into the last month of the year!<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2773\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221130_141757A-768x1024.jpg\" alt=\"Phil Bell cuts new Moulding strips for GER 5\" width=\"660\" height=\"880\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221130_141757A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221130_141757A-225x300.jpg 225w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>A key step forward with the restoration of Great Eastern Railway Royal Saloon No. 5 was achieved on Friday when the fabric on the walls of the west end saloon was completed with the remainder of the missing wooden mouldings being made by Phil Bell and then fitted.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2774\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221202_141314A-768x1024.jpg\" alt=\"John Davis at work in the west saloon in GER 5\" width=\"660\" height=\"880\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221202_141314A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221202_141314A-225x300.jpg 225w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>The saloon was then cleared of materials and the carpet vacuumed by John Davis \u2013 just don\u2019t tell Mrs D. that he has been passed out on the vacuum cleaner!<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2775\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221202_153619A-768x1024.jpg\" alt=\"The kitchen before\" width=\"660\" height=\"880\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221202_153619A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221202_153619A-225x300.jpg 225w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>With Anne and Phil Burton still busy on the chaise longue in the east saloon, Phil Bell and John Davis will now turn their attention to the kitchen area. We show therefore a \u2018before\u2019 photo that we will eventually be able to compare with the finished job.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2776\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221130_141836A-768x1024.jpg\" alt=\"Ed at work in the guard's compartment\" width=\"660\" height=\"880\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221130_141836A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221130_141836A-225x300.jpg 225w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>Ed has meanwhile continued his lone work on the woodwork in the guard\u2019s compartment \u2013 we let him out for lunch!<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2777\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/IMG_2424-1024x768.jpg\" alt=\"Sam cleaning FR 20's firebox\" width=\"660\" height=\"495\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/IMG_2424-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/IMG_2424-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/IMG_2424-768x576.jpg 768w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>Sam has been doing the majority of the dirty work in FR 20 and is seen here busy cleaning the firebox.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2778\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221202_121545-1024x768.jpg\" alt=\"Jon Dixon, Neil Glover and Sam Middleton during FR 20's washout on Friday, 2nd December\" width=\"660\" height=\"495\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221202_121545-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221202_121545-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221202_121545-768x576.jpg 768w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>Friday saw FR 20 receiving its boiler washout prior to its 14-month boiler inspection. Jon Dixon and Neil Glover travelled down from Lancaster to give us a hand and can be seen here with Sam aiming water down one of the firebox washout plug holes in the cab.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-2779 size-large\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221202_123204-e1670361849403-768x1024.jpg\" alt=\"Sam seeing the funny side of getting a drenching\" width=\"660\" height=\"880\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221202_123204-e1670361849403-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221202_123204-e1670361849403-225x300.jpg 225w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>Sam seemed to get rather wet during the process but saw the funny side of it.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2780\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221130_141128A-768x1024.jpg\" alt=\"Sam removing the ring below Caliban's smokebox chimney hole\" width=\"660\" height=\"880\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221130_141128A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221130_141128A-225x300.jpg 225w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>Sam has also been working on <em>Caliban<\/em>, seen here in the process of removing the ring underneath the chimney hole in the old smokebox ready for re-use. And\u00a0John Dixon has been preparing new sections of metal for <em>Caliban<\/em>\u2019s cab.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2781\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221130_155629A-768x1024.jpg\" alt=\"Keith with Wootton Hall's steampipe flanges\" width=\"660\" height=\"880\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221130_155629A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2022\/12\/20221130_155629A-225x300.jpg 225w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>And Keith has been working on the flanges that connect the main steam pipes to <em>Wootton Hall<\/em>\u2019s smokebox.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Here we are, a day late due to Christmas demands on our time, and into the last month of the year! A key step forward with the restoration of Great Eastern Railway Royal Saloon No. 5 was achieved on Friday when the fabric on the walls of the west end saloon was completed with the &hellip; <a href=\"https:\/\/furnessrailway.co.uk\/about\/?p=2784\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Tuesday 6th December 2022<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2784","post","type-post","status-publish","format-standard","hentry","category-uncategorised"],"_links":{"self":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2784","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2784"}],"version-history":[{"count":1,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2784\/revisions"}],"predecessor-version":[{"id":2785,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2784\/revisions\/2785"}],"wp:attachment":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2784"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2784"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2784"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}