{"id":2981,"date":"2023-07-03T16:22:39","date_gmt":"2023-07-03T15:22:39","guid":{"rendered":"http:\/\/www.furnessrailwaytrust.org.uk\/about\/blog\/?p=2981"},"modified":"2023-07-03T16:22:39","modified_gmt":"2023-07-03T15:22:39","slug":"monday-3rd-july-2023","status":"publish","type":"post","link":"https:\/\/furnessrailway.co.uk\/about\/?p=2981","title":{"rendered":"Monday 3rd July 2023"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2970\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_164750-1024x768.jpg\" alt=\"5643's boiler is lifted off the frames.\" width=\"660\" height=\"495\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_164750-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_164750-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_164750-768x576.jpg 768w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>The big news this week is that GWR\u00a00-6-2T No. 5643\u2019s boiler was lifted out of the frames for assessment and repair in foul weather last Friday afternoon.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2971\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_165126A-768x1024.jpg\" alt=\"Keith burning off the ashpan retaining bolts\" width=\"660\" height=\"880\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_165126A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_165126A-225x300.jpg 225w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>Part of the operation involved removing the ashpan from underneath 5643\u2019s firebox before it could be settled down on the weltrol. Keith is seen here applying some heat to release the retaining bolts.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2972\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_154811A-768x1024.jpg\" alt=\"5643's bunker touches down\" width=\"660\" height=\"880\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_154811A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_154811A-225x300.jpg 225w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>Prior to that, <em>Caliban<\/em>\u2019s boiler had been lifted to a position alongside the shed to make way for 5643\u2019s boiler on the weltrol. 5643\u2019s bunker has also been lifted off for inspection and repairs.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2974\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230628_115439A-768x1024.jpg\" alt=\"Ed descales one of 5643's water tanks\" width=\"660\" height=\"880\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230628_115439A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230628_115439A-225x300.jpg 225w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>Other work has continued on 5643 with Ed descaling one of the tanks in between the showers last Wednesday.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2976\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_142045-1024x768.jpg\" alt=\"Upholstering of the new guard's compartment bench seat in progress\" width=\"660\" height=\"495\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_142045-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_142045-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_142045-768x576.jpg 768w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>Upholstering of Great Eastern Railway royal saloon No. 5 is still in full swing with a glimpse here of work on the new foam bench seat in the guard\u2019s compartment.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2977\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_135642A-768x1024.jpg\" alt=\"John Davis removing a door step and tacks from GER No. 5\" width=\"660\" height=\"880\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_135642A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_135642A-225x300.jpg 225w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>John Davis has removed the carpet in the east saloon and is seen removing a door step and unwanted tacks from the floor.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2978\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230628_115823-1024x768.jpg\" alt=\"John Dixon cleaning the royal sh*t pot\" width=\"660\" height=\"495\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230628_115823-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230628_115823-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230628_115823-768x576.jpg 768w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>John Dixon has been giving the royal loo a good clean\u2026..<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2979\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_143342-1024x768.jpg\" alt=\"The royal loo seat varnished and ready for a royal bum\" width=\"660\" height=\"495\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_143342-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_143342-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2023\/07\/20230630_143342-768x576.jpg 768w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/>\u2026..whilst Tim has given the loo seat a coat of varnish \u2013 think he got the better of the two jobs!<\/p>\n<p>Finally, for FRT members, just to let you know that Alan has been busy putting together the latest edition of <em>The Iron Horse<\/em>\u00a0magazine which, hopefully, should be sent off for printing this week.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The big news this week is that GWR\u00a00-6-2T No. 5643\u2019s boiler was lifted out of the frames for assessment and repair in foul weather last Friday afternoon. Part of the operation involved removing the ashpan from underneath 5643\u2019s firebox before it could be settled down on the weltrol. Keith is seen here applying some heat &hellip; <a href=\"https:\/\/furnessrailway.co.uk\/about\/?p=2981\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Monday 3rd July 2023<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2981","post","type-post","status-publish","format-standard","hentry","category-uncategorised"],"_links":{"self":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2981","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2981"}],"version-history":[{"count":1,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2981\/revisions"}],"predecessor-version":[{"id":2982,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/2981\/revisions\/2982"}],"wp:attachment":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2981"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2981"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2981"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}