{"id":3561,"date":"2025-01-27T18:50:41","date_gmt":"2025-01-27T18:50:41","guid":{"rendered":"https:\/\/furnessrailway.co.uk\/about\/?p=3561"},"modified":"2025-01-27T18:53:07","modified_gmt":"2025-01-27T18:53:07","slug":"monday-27th-january-2025","status":"publish","type":"post","link":"https:\/\/furnessrailway.co.uk\/about\/?p=3561","title":{"rendered":"Monday, 27th January 2025"},"content":{"rendered":"\n<p>Work has again continued with the overhaul of Great Western Railway 0-6-2T locomotive No. 5643 with Ed and Ron reaching the landmark stage on Saturday of drilling from the outside all the firebox stays to be replaced. There is still work to be done from the inside of the firebox before the holes can be reamed and tapped.<\/p>\n\n\n\n<p>Another shunt of the shed has taken place and Furness Railway No. 20\u2019s engine has been split from the tender in order for it to be squeezed into the heated part of the shed, above the pit, to enable winter maintenance to take place. 5643\u2019s chassis is now at the west end of the shed to allow work to replace the cylinder liners to take place.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/furnessrailway.co.uk\/ciac\/wp-content\/uploads\/2025\/01\/20250125_141256A-768x1024.jpg\" alt=\"FR 20 in the FRT shed split from its tender\" class=\"wp-image-1578\"\/><\/figure>\n\n\n\n<p>With the Peckett 0-4-0ST Caliban\u2019s boiler away at Williton for the fitting of a new firebox, attention has turned to repairing the cab and readying it for painting. A skim of filler is being applied to improve the surface of the metalwork.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/furnessrailway.co.uk\/ciac\/wp-content\/uploads\/2025\/01\/20250125_141311A-768x1024.jpg\" alt=\"Work in progress on Caliban's cab\" class=\"wp-image-1579\"\/><\/figure>\n\n\n\n<p>Sam took a trip to Embsay yesterday and found the Trust\u2019s \u2018Austerity\u2019 0-6-0ST Cumbria in service.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/furnessrailway.co.uk\/ciac\/wp-content\/uploads\/2025\/01\/IMG-20250126-WA0010-SM-1024x768.jpg\" alt=\"Cumbria in service at the Embsay &amp; Bolton Abbey Steam Railway on Sunday, 26th January 2025\" class=\"wp-image-1580\"\/><\/figure>\n\n\n\n<p>Finally, the Ribble Steam Railway\u2019s workshop has turned out Peckett 0-4-0ST No. 1935 Hornet of 1937, which was being warmed up on Saturday in the sunshine in readiness for a full steam test, hopefully this week.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/furnessrailway.co.uk\/ciac\/wp-content\/uploads\/2025\/01\/20250125_140415-1024x768.jpg\" alt=\"Hornet being warmed up on Saturday, 25th January 2025\" class=\"wp-image-1581\"\/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Work has again continued with the overhaul of Great Western Railway 0-6-2T locomotive No. 5643 with Ed and Ron reaching the landmark stage on Saturday of drilling from the outside all the firebox stays to be replaced. There is still work to be done from the inside of the firebox before the holes can be &hellip; <a href=\"https:\/\/furnessrailway.co.uk\/about\/?p=3561\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Monday, 27th January 2025<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3561","post","type-post","status-publish","format-standard","hentry","category-uncategorised"],"_links":{"self":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/3561","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3561"}],"version-history":[{"count":2,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/3561\/revisions"}],"predecessor-version":[{"id":3563,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/3561\/revisions\/3563"}],"wp:attachment":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3561"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3561"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3561"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}