{"id":459,"date":"2017-10-31T23:49:46","date_gmt":"2017-10-31T23:49:46","guid":{"rendered":"http:\/\/www.furnessrailwaytrust.org.uk\/about\/blog\/?p=459"},"modified":"2017-10-31T23:49:46","modified_gmt":"2017-10-31T23:49:46","slug":"tuesday-31st-october-2017","status":"publish","type":"post","link":"https:\/\/furnessrailway.co.uk\/about\/?p=459","title":{"rendered":"Tuesday 31st October 2017"},"content":{"rendered":"<p>We&#8217;ve been back into full swing this week with plenty of activity to report.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-456\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/20171027_140411A-576x1024.jpg\" alt=\"Mike in the RMB fuse box\" width=\"576\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/20171027_140411A-576x1024.jpg 576w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/20171027_140411A-169x300.jpg 169w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/20171027_140411A-768x1365.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/20171027_140411A-1200x2133.jpg 1200w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/>There has been more snagging work taking place on the RMB, with John Dixon tidying up the varnish where he has repaired the panelling, Mike has been doing some more testing of the electrics (seen here) and John Davis has been cleaning up the aluminium panelling. <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-448\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5527-1024x768.jpg\" alt=\"cleaned and polished light for the RMB servery area\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5527-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5527-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5527-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5527-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>A newly polished ceiling light is also seen here ready for fitting. Tim and Fred have been back on the roof of the TPO vehicle, which has had a through clean up and just needs a final sweep before applying filler and primer where necessary. Howard has finished removing the yellow lining tape on the sides.<\/p>\n<p>Ade has continued some reassembly of <em>Caliban<\/em>, with the sand boxes being lifted back into position. Howard has started to fabricate some new sand box covers.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-455\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/20171027_110454A-576x1024.jpg\" alt=\"Steel plate from Brazil\" width=\"576\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/20171027_110454A-576x1024.jpg 576w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/20171027_110454A-169x300.jpg 169w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/20171027_110454A-768x1365.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/20171027_110454A-1200x2133.jpg 1200w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/>Keith took delivery of some new steel plate (from Brazil, apparently) and started cutting it in readiness to be stitched on to the front of <em>Wootton Hall<\/em>&#8216;s tender chassis.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-446 size-large\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5523A-864x1024.jpg\" alt=\"Vacuum retaining valve for Wootton Hall\" width=\"840\" height=\"996\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5523A-864x1024.jpg 864w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5523A-253x300.jpg 253w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5523A-768x911.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5523A-1200x1423.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/><\/p>\n<p>A second hand vacuum retaining valve has been obtained for <em>Wotton Hall<\/em> and kindly sponsored by one of our members.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-445\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5522-1024x768.jpg\" alt=\"Unmachined hydrostatic lubricator warming cocks for Wootton Hall\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5522-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5522-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5522-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5522-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Two un-machined hydrostatic lubricator warming cocks for the\u00a0<em>Hall<\/em> have also been purchased at \u00a360 each and sponsors for these are also sought.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-447\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5525A-768x1024.jpg\" alt=\"The new high pressure power washer is assembled\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5525A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5525A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/100_5525A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>Quite some time was spent last Wednesday assembling the new petrol powered high pressure washer that was donated recently. This was in readiness for the visit tomorrow to Shildon for the preparation of FR 20 for its boiler survey on Friday. Despite actually reading the manual for once (!!) and applying the necessary oil and petrol, the engine refused to start. Fortunately, Ribble Rail&#8217;s Jason Finnerty had a look at it and detected that there was no flow of fuel to the engine &#8211; it appears that the fuel filter was solid. Once a hole had been drilled in the filter, the engine worked fine!<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-449\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/DSC00331-1024x768.jpg\" alt=\"The mess room in the process of touching down\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/DSC00331-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/DSC00331-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/DSC00331-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/DSC00331-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Saturday saw the long awaited move of the recently acquired mess room into its new resting place by the shed. Keith had laid out some supporting blocks, which John then deemed to be perfectly aligned(!), and the big Hi-ab lorry from JN Civils next door easily managed the job. <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-450\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/DSC00334-1024x768.jpg\" alt=\"The mess room in its new home\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/DSC00334-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/DSC00334-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/DSC00334-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/DSC00334-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Just the electrics and the drain to sort out now. And maybe now we see a need to keep it grey, but paint the corner posts yellow?!<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-451 aligncenter\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/IMG_20171028_113729.jpg\" alt=\"So which Alan is the spook?\" width=\"390\" height=\"520\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/IMG_20171028_113729.jpg 390w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/IMG_20171028_113729-225x300.jpg 225w\" sizes=\"auto, (max-width: 390px) 100vw, 390px\" \/>The weekend also saw the annual spooky trains at the Ribble Steam Railway, who created their own spook called Alan. The two Alans are seen here side by side &#8211; guess which is the spook!<\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-452\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/IMG_20171028_204631.jpg\" alt=\"Spook Live Steam at the Engine Inn\" width=\"520\" height=\"390\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/IMG_20171028_204631.jpg 520w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/IMG_20171028_204631-300x225.jpg 300w\" sizes=\"auto, (max-width: 520px) 100vw, 520px\" \/>Live Steam<\/em> reunited after a summer&#8217;s absence from the music stage to perform at the Engine Inn at Cark &#8211; see another spooky photo or two! <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-457\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/IMG_0501A-1024x768.jpg\" alt=\"Tim and Alan perform the Rawtenstall Annual Fair\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/IMG_0501A-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/IMG_0501A-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/IMG_0501A-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/10\/IMG_0501A-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Everyone seemed to enjoy themselves and the band may well be back there for New Year&#8217;s Eve.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We&#8217;ve been back into full swing this week with plenty of activity to report. There has been more snagging work taking place on the RMB, with John Dixon tidying up the varnish where he has repaired the panelling, Mike has been doing some more testing of the electrics (seen here) and John Davis has been &hellip; <a href=\"https:\/\/furnessrailway.co.uk\/about\/?p=459\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Tuesday 31st October 2017<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-459","post","type-post","status-publish","format-standard","hentry","category-uncategorised"],"_links":{"self":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/459","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=459"}],"version-history":[{"count":1,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/459\/revisions"}],"predecessor-version":[{"id":460,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/459\/revisions\/460"}],"wp:attachment":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=459"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=459"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=459"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}