{"id":502,"date":"2017-11-27T23:44:46","date_gmt":"2017-11-27T23:44:46","guid":{"rendered":"http:\/\/www.furnessrailwaytrust.org.uk\/about\/blog\/?p=502"},"modified":"2017-11-27T23:45:02","modified_gmt":"2017-11-27T23:45:02","slug":"monday-27th-november-2017","status":"publish","type":"post","link":"https:\/\/furnessrailway.co.uk\/about\/?p=502","title":{"rendered":"Monday 27th November 2017"},"content":{"rendered":"<p>Work continues apace on the RSR&#8217;s TPO vehicle which is currently being repainted in the FRT shed. <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-491\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5553A-768x1024.jpg\" alt=\"Mike Rigg attends to one of the water filler indents on the TPO\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5553A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5553A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5553A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>Tim has begun the task of sanding down the sides whilst Mike Rigg and John Davis have been attending to the end sockets which allow access to the water filler pipes. A new cover will be required for one of the sockets. Mike and John have also been removing the seals from around the sliding doors in order to allow access for painting. <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-497\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/20171124_123047_38587854992_oMR-e1511794141462-576x1024.jpg\" alt=\"John Davis paints the gas holder door after the new warning sign has been attached\" width=\"576\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/20171124_123047_38587854992_oMR-e1511794141462-576x1024.jpg 576w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/20171124_123047_38587854992_oMR-e1511794141462-169x300.jpg 169w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/20171124_123047_38587854992_oMR-e1511794141462-768x1365.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/20171124_123047_38587854992_oMR-e1511794141462-1200x2133.jpg 1200w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/>The new replacement warning sign has been affixed to the new gas compartment door and the paint touched up. <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-494\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5557-1024x768.jpg\" alt=\"Fred removing a redundant foot step on the TPO\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5557-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5557-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5557-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5557-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Fred has been cleaning up the bogies with a wire brush and has removed the redundant steps (the bogies came from a different vehicle) whilst Roger has begun the task of applying primer.<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-495\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5556-1024x768.jpg\" alt=\"Roger Benbow priming one of the TPO bogies\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5556-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5556-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5556-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5556-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/><\/p>\n<p>Keith has continued to work on the replacement steel ends to the Hall&#8217;s tender frames.<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-490\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5552A-768x1024.jpg\" alt=\"Ade cleans out a hole ready to receive a pin in Caliban's motion\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5552A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5552A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5552A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>And\u00a0Ade has been attending to <em>Caliban<\/em>&#8216;s motion, seen here cleaning out one of the holes.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-492\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5554-1024x768.jpg\" alt=\"A new kitchen unit made up in the mess room\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5554-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5554-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5554-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5554-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>John Dixon has continued the task of fitting out the kitchen area of the new mess room and has found that Wickes now have a kitchen sale as well as a 15% discount because they are reorganising the store! <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-493\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5558A-768x1024.jpg\" alt=\"John the kitchen fitter\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5558A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5558A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5558A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>Cue the purchase of a new three metre work top!<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-489\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5549-1024x768.jpg\" alt=\"New paint cabinets\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5549-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5549-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5549-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5549-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Two new cabinets for the storage of paint have arrived and been filled and lights have now appeared in the 1st class North London Railway coach which is currently being used to store materials.<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-496\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5565A-768x1024.jpg\" alt=\"Mike Rigg and John Davis string up lights in the North London Coach storage area\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5565A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5565A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/100_5565A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/p>\n<p>Mike Rigg has kindly taken on the role of FRT Membership Secretary following the resignation of Peter Allcock. We would like to thank Peter for his hard work since taking on the job and wish him well for the future.<\/p>\n<p>The Trust&#8217;s folk group, <em>Live Steam<\/em>, has had a busy weekend with the band appearing at the Old Friends in Ulverston on Saturday evening for a Lancashire Night, seen here under the Christmas decorations. <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-500\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/IMG_20171125_233158AP.jpg\" alt=\"Live Steam at the Old Friends on Saturday, 25th November\" width=\"520\" height=\"390\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/IMG_20171125_233158AP.jpg 520w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/IMG_20171125_233158AP-300x225.jpg 300w\" sizes=\"auto, (max-width: 520px) 100vw, 520px\" \/>They then performed for an hour and a half at Abbeyfield in Ulverston early Sunday afternoon before being joined by George on the out door Theatre Street stage at 4 pm to close down the Dickensian Festival in fine style!<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-501\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/IMG_20171126_162204.jpg\" alt=\"Live Steam with George present in full voice on Sunday afternoon at the Dickfest\" width=\"520\" height=\"390\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/IMG_20171126_162204.jpg 520w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2017\/11\/IMG_20171126_162204-300x225.jpg 300w\" sizes=\"auto, (max-width: 520px) 100vw, 520px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Work continues apace on the RSR&#8217;s TPO vehicle which is currently being repainted in the FRT shed. Tim has begun the task of sanding down the sides whilst Mike Rigg and John Davis have been attending to the end sockets which allow access to the water filler pipes. A new cover will be required for &hellip; <a href=\"https:\/\/furnessrailway.co.uk\/about\/?p=502\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Monday 27th November 2017<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-502","post","type-post","status-publish","format-standard","hentry","category-uncategorised"],"_links":{"self":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/502","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=502"}],"version-history":[{"count":2,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/502\/revisions"}],"predecessor-version":[{"id":504,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/502\/revisions\/504"}],"wp:attachment":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=502"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=502"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=502"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}