{"id":552,"date":"2018-01-08T23:03:36","date_gmt":"2018-01-08T23:03:36","guid":{"rendered":"http:\/\/www.furnessrailwaytrust.org.uk\/about\/blog\/?p=552"},"modified":"2018-01-08T23:03:36","modified_gmt":"2018-01-08T23:03:36","slug":"monday-8th-january-2018","status":"publish","type":"post","link":"https:\/\/furnessrailway.co.uk\/about\/?p=552","title":{"rendered":"Monday 8th January 2018"},"content":{"rendered":"<p>A belated happy New Year to all our readers as we head into a fresh year. Who knows what it will bring?<\/p>\n<p>There wasn&#8217;t much let up in the pace of work at Preston over the Christmas period with working parties continuing to take place on their usual days of the week; Wednesdays, Saturdays and Sundays.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-540\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5597-1024x768.jpg\" alt=\"The concrete under the east end shed doors is now complete\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5597-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5597-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5597-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5597-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>The first photo shows the completed concreting under the east end shed doors which was laid just before Christmas. There is still plenty more to do in the east half of the shed, but the more immediate task has since been to continue the installation of the kitchen in the new mess room. As John Dixon is both our head of concreting and chief plumber, it is a case of one job at a time. <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-546\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5610-1024x768.jpg\" alt=\"More new kitchen units under construction in the new mess room\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5610-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5610-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5610-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5610-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>We then need to dig a channel outside the mess room to allow a pipe to be laid to a nearby drain manhole. Once this is achieved, new tarmac can be laid there\u00a0as part of the overall plan to create a new playground.<\/p>\n<p>Inside the shed, work has continued on the repairs and painting of the RSR&#8217;s TPO vehicle. <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-543\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5607A-768x1024.jpg\" alt=\"John Davis and Howard Fletcher inspect the RSR's TPO door which requires corrosion repairs\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5607A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5607A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5607A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>John David and Howard Fletcher are seen here examining a corroded and ill fitting door whilst, below, Ade is seen demonstrating his method of fixing the problem &#8211; with a hammer! <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-544\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5612A-768x1024.jpg\" alt=\"Adrian shows how C&amp;W repairs should be carried out - with his hammer\" width=\"768\" height=\"1024\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5612A-768x1024.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5612A-225x300.jpg 225w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5612A-1200x1600.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>Tim has continued with the filling and sanding, Paul with the renewal of rotted woodwork, and Fred and Roger have continued to clean and paint the headstocks and bogies.<\/p>\n<p>Ade has spent the rest of his time moving on the project to restore <em>Caliban<\/em> including more sanding and painting .<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-549\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5614-1024x768.jpg\" alt=\"Alan Ogden with Fluff's fuse box\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5614-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5614-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5614-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5614-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Alan Ogden made a welcome re-appearance from Devon to refurbish <em>Fluff<\/em>&#8216;s fuse box.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-545\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5608-1024x768.jpg\" alt=\"More steelwork has been added to the rear of Wootton Hall's tender chassis\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5608-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5608-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5608-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5608-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>Keith has continued to assemble more steelwork on <em>Wootton Hall<\/em>&#8216;s tender frames as can be seen from this view of the rear of the chassis. Some more components for the locomotive, which have become available recently, have been purchased, including these two rear valve head cover castings which cost \u00a360 each.<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-541\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5603-1024x768.jpg\" alt=\"Two new rear valve head cover glands castings - \u00a360 each.\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5603-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5603-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5603-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5603-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/><\/p>\n<p>Plus there are four castings which will make up two steam heat valves. <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-542\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5604-1024x768.jpg\" alt=\"Two new steam heat castings. \u00a3240 each in total.\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5604-1024x768.jpg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5604-300x225.jpg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5604-768x576.jpg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/100_5604-1200x900.jpg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/>The smaller items cost \u00a360 each whilst the larger casting cost \u00a3180 each.<\/p>\n<p>Sponsorship of any of these items would be very greatly appreciated.<\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-547\" src=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/received_1632116023543551-1024x768.jpeg\" alt=\"Live Steam in action on New Year's Eve\" width=\"840\" height=\"630\" srcset=\"https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/received_1632116023543551-1024x768.jpeg 1024w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/received_1632116023543551-300x225.jpeg 300w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/received_1632116023543551-768x576.jpeg 768w, https:\/\/furnessrailway.co.uk\/about\/wp-content\/uploads\/2018\/01\/received_1632116023543551-1200x900.jpeg 1200w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/><\/em>Finally,\u00a0<em>Live Steam<\/em>\u00a0played their last gig of 2017 at the Engine Inn at Cark-in-Cartmel. Both Alan and Tim were suffering for the excesses of singing on the Santa Special Trains at Preston but just about managed to sing without too much coughing and spluttering!<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A belated happy New Year to all our readers as we head into a fresh year. Who knows what it will bring? There wasn&#8217;t much let up in the pace of work at Preston over the Christmas period with working parties continuing to take place on their usual days of the week; Wednesdays, Saturdays and &hellip; <a href=\"https:\/\/furnessrailway.co.uk\/about\/?p=552\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Monday 8th January 2018<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-552","post","type-post","status-publish","format-standard","hentry","category-uncategorised"],"_links":{"self":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/552","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=552"}],"version-history":[{"count":1,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/552\/revisions"}],"predecessor-version":[{"id":553,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=\/wp\/v2\/posts\/552\/revisions\/553"}],"wp:attachment":[{"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=552"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=552"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/furnessrailway.co.uk\/about\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=552"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}