Monday 11th November

At last, the overhaul of Great Western Railway 0-6-2T locomotive No. 5643 has reached the point where some re-assembly is starting to take place. The frames have been lowered fully onto the wheelsets and six of the eight springsĀ have been re-fitted. Keith and John Dixon are seen here lifting a radial truck spring into position …