Work has progressed on fitting the controls to the new injector steam valves on FR 20. It has been possible to fit the right hand control through an existing hole in the cab spectacle plate but for some reason a new hole was required on the left hand side which was drilled by Sam.
Phil is still working his way towards fitting the panels on Fluff‘s engine compartment.
Ade has been fitting felt pads to Caliban‘s axlebox keeps. He managed to find some horse hair to provide extra cushioning under the pads, which saved the need for him to cut off his own locks!
Paul Newton is now in the final stages of restoring the former L&NWR platform seat from Preston station.
Ron has been cutting out more corroded steel from Wootton Hall‘s tender tank.
Keith has completed the assembly of Wootton Hall’s tender vacuum cylinder and it is being set up for a test.
Finally, the Annual General Meeting will be held this year at the FRT shed at Preston at 7.30 pm on Tuesday evening, 28th September; please put this in your diary. The formal invitations to members will go out with the latest edition of The Iron Horse magazine, which is now in production with the proofs being returned to the printer last week.
John Dixon has been continuing his expeditions into the tender tank, seen here mixing the two pack paint…
…and then applying it.
The Fluff gang has been busy test fitting side panels to the engine compartment. Paul Balshaw is seen here applying primer to one of the panels…
…whilst Phil Bell has been removing paint to make the panels fit correctly!
Keith has been renovating and assembling Wootton Hall‘s tender vacuum cylinder. First a new slipping band had to be fitted to the piston. This can be a frustrating exercise: the holes in the piston, the band and the steel band that keeps the slipping band in place have all to be lined up. ‘G’ clamps are the preferred method to achieve this and the FRT’s full complement of clamps were deployed to the task on Wednesday morning.
By Friday Keith had fitted the rubbing band, inserted the piston, fitted the sealing rings and was to be seen tightening up the top and bottom parts of the vacuum cylinder.
Last Wednesday saw yet another working party convene at Embsay in an effort to improve the performance of Cumbria‘s left hand injector. New parts had been fitted during the previous visit but the bottom cone had proved to be a tight fit and it had been decided not to put too much weight on it whilst being screwed into position. This time, on examination, there was far less resistance and, with the assistance of a length of pipe, Adrian was able to screw it until it reached the end of its thread.
Tim caught Alan apparently taking a photo of the lovely L&NWR saloon.
Meanwhile Ade contented himself with one of his artistic cab spectacle photos of Welsh Guardsman departing Embsay with a train to Bolton Abbey.
Back at Preston, the Fluff gang has again been busy. We see here a planning meeting on Friday – is this a new concept?!
Phil and John Davis then set about test fitting the first side panel to the new angle support piece.
Fred then set about cleaning more of Fluff’s panels for painting.
Meanwhile Roger took advantage of some better weather by continuing the paint job on the former Foxfield water column.
Work also continued on FR 20 where Stewart Waugh had applied some anti-corrosion solution to the tender coal space after which Tim added some grey undercoat. Having finished (and won!) his long running battle with fitting the engine’s vacuum pipe, John Dixon was busy on the inside of the tender tank applying some two pack paint, again to prevent future corrosion.
Further work has taken place on FR 20 with Tim tidying up some of the corrosion and paintwork on top of the tender and John Dixon still finding work to do on the engine’s vacuum pipe which is located under the right hand valance.
John has been fabricating two brackets to retain the vacuum pipe in place and is seen here removing sharp edges that could potentially cause harm to those working underneath the loco.
Work has also continued on Fluff with Phil Bell making some adjustments to the cab spectacle plate and John Davis drilling holes in the new angles which support the engine compartment roof.
Alan then fitted the studs and until then, all was going well…..
Sam is seen watching Ade under the engine during the process of fitting the links to the shaft.
Back at Preston we have a photo of two repaired and painted sand boxes for Wootton Hall.
We were very pleased to welcome back John on Saturday who is seen here filing a new bracket to carry FR 20’s engine vacuum pipe.
Those of you who read the blog a fortnight ago might have spotted a new locomotive headboard with the words “The Furness Railway Trust”. Sponsored by one of our members, this is now at Preston with a view to promoting the FRT and is seen on the front of FR 20.