Another inter-holiday news burst for you before things get back to normal…!
We are sorry to have to start by recording the passing of Jim Jackson (“Captain Birdseye” to some), former skipper of the MV Teal on Windermere who died at St Mary’s Hospice, Ulverston, on the 27th July at the age of 88. Jim served on the Windermere steamers for 42 years, following his father, also Jim, into the business. Those crewing trains on the L&HR could always expect a wave from the bridge from Jim followed, perhaps, by a pithy comment which kept you on your toes. Jim married Pam, who worked on the admin side of the steamer operation, and they lived at Railway Cottages, Newby Bridge, Jim’s home since the age of four. Our thoughts are with Pam and family at this sad time.
There has again been more progress at Preston, the highlight being the shot blasting of the tender frames, which have now also been primed, with most available working members lending a hand with the paint brush.
The frames are now in the process of receiving undercoat paint.
Work has also continued on Wootton Hall‘s engine, with more of the replacement metal for the running board being cut and the buffer beam being filled, sanded and primed; the latter will enable the buffers to be bolted on again. And Matt has been busy making new nuts for the cylinder and valve studs.

The RMB, lino laying now completed, has received further attention from Mike and Paul who have re-installed the buffet sliding door and the cupboards and “bum rest” in the servery area.

There has been more attention given to Caliban, with Adrian working on the frames and sand boxes, John H in the cab, and Howard on the sanding gear.
More progress has also been made with levelling the track on road three of the unheated portion of the shed, with Ed, Phil and Keith seen here.
Finally, Alan and Tim were at Shildon on Friday for a training session on the new rule book and newly issued procedures. There then followed a further practical assessment on FR 20. The locomotive was again used on Saturday for more crew assessments as well as for operating a passenger service.
John is seen above unrolling the last piece of lino for fitting in the RMB, which he completed today. Well done! It looks great!
The cab has been brought round to the shed in case there is time to sand blast it tomorrow with Wootton Hall‘s tender frames.
As you will see from the photo, it attracted some interest and Alan is seen making some modifications to the bunker.
There has been more work also on Wootton Hall where Keith has been cutting new plate to replace the running boards above the cylinders, which had corroded beyond economic repair. Fred has again been cleaning components.
Matt Bedford has been continuing the task on running a die nut over the studs for the cylinder cover.
A new reversing handle casting for Wootton Hall has appeared, purchased from the Betton Grange team. No doubt Keith would appreciate any contributions towards the cost..
We show a first photo of the interior of the new mess facility. Plans are being made to re-site it and have it plumbed in, hopefully in the not too distant future. Meanwhile, we have taken delivery of some surplus chairs from the RSR which will be used in the mess room and also for future meetings at Preston.
John has continued his lino laying in the RMB and should hopefully move into the servery area this next week, where the melamine panels and metal beading strips are now securely in place after attention from Mike and Paul. 
After screwing in the beading, Paul has been cleaning up the corner cupboards and assisting Tim with replacing a sliding door runner and with refitting the door itself. David has also removed the buffet door and bottom runner ready for the new lino.
Fred has again been busy cleaning some of Wootton Hall‘s brake components….
…whilst Roger has been cleaning up the threads on the end of the brake beams using a rather unconventional bench to support them! George has, amongst other things, been needle gunning the running plate. Matt has been cleaning up threads on the studs for the cylinder covers whilst Keith has continued to fit lubrication pipework.
We mustn’t forget the continuing work on Fluff where Alan Ogden has finished refurbishing the ammeter.
Looking forward, Alan and Alison are due to head off to Shildon this next weekend for FR 20’s next steamings and a person has been engaged to sand blast Wootton Hall‘s tender frames on the 10th August.
We start this week with the news that the Trustees have agreed the purchase of the portable office on the Ribble Steam Railway site, close to the FRT shed, that was formerly used by the Amber Trains training company. The acquisition of such a building for a mess room had been planned for some time, but the project has been on hold waiting for space alongside the shed to be cleared. The fact that this building is already on site and would otherwise have been returned to the hirer meant that a deal beneficial to both parties, which saved on transport costs, could be done. David has now transferred across the money to complete the purchase, so all we need now are some tables, chairs, kitchen units and the hanging baskets..!
There has, however, been considerable progress with the re-installation of the melamine panels in the RMB, assisted by the welcome return of Paul Newton on Friday. The photographs speak for themselves. There is, however, still plenty to do before this job is finished.
Fred and Roger appeared on Friday and continued their work on cleaning components. Fred is seen here using the needle gun on Wootton Hall‘s cylinder block. Keith and Matt have also been at work on the loco.
And we mustn’t forget the continuing work on Fluff, where Alan Ogden has been refurbishing the electrical termination boxes.
There was much measuring and double checking of measurements on Wednesday and Friday as the lino was cut and it is hoped to be able to glue some of it down permanently this next week. Re-instatement of the panelling in the servery area has had to take a back seat during Mike’s absence but no doubt its time will come.
Adrian had a quiet day under Caliban with the paintbrush on Wednesday whilst Alan and John H continued their work on the running board repairs. Howard did further work on the sanding gear whilst Alan Ogden (who seems to be commuting between Lancashire and Devon) re-appeared to work on Fluff.
Mike has been fitting more wood in the buffet car and arranged a trial fit of the melamine panels in the servery area to check the location of the securing holes for the ‘bum rest’ which has then to be fitted and aligned with suitable wooden backing pieces behind the melamine.
Mike also refitted the original sign back on to the old gas box door.
Tim took the plunge and cut the first piece of lino to rough dimensions ready for detailed fitting whilst John continued his task of repairing the flooring at the door entrances and also started the task of setting the brass door treads into the floor.
There has been more fitting and welding of new pieces for Caliban‘s new running board.
Staying with Caliban, Howard has been preparing the tooling for creating a square hole in the new piece of sanding gear.
Fred has been busy again with the wire brush cleaning up a borrowed cylinder lubrication bracket which is to be used as a pattern for a new one for Wootton Hall.
Matt has again been busy with the paintbrush priming the Hall’s cylinders.
And finally, Alison has now received a new batch of Cumbria badges (sponsored by a member) to add to the 5643 badges displayed last week – why not buy one of each at £3.95 per badge?
Mike and Tim continued on the job of piecing together panelling and wood for the servery area of the RMB. All a bit confusing as they have found some bits of window frame which don’t seem to have a home! However, there is a plan to get more of the jigsaw back in place this next Wednesday and it won’t be too long before it will be time to lay some lino.
Absent from the blog for a few weeks have been reports of Howard breaking bits of Caliban‘s sanding gear. Just for once we have a photo of a new component (which Howard has made) alongside its mate and the broken piece.
Further red oxide has been applied to the front frames of Wootton Hall and Tim has taken some time out from the RMB to start applying a layer of filler on the front buffer beam to cover up dimples in the metalwork caused by corrosion over the years. Keith has been busy with some of the new copper tube for the lubrication runs and it is planned to have a photo of some of this work in a future blog. Meanwhile, on a slightly smaller loco, Anthony Jolly reappeared on Wednesday after the birth of his daughter to recommence work on Fluff.
Outside the shed, a Pete Marquis lorry has been steadily removing the large pile of spoil where the future FRT mess hut is to be sited. But we are told that even more spoil might land there before the mess hut can appear…!
Trustee Peter van Zeller and member Dickon Chaplin-Brice are seen here on Saturday with the soon to be unveiled plaque to mark the re-opening of the railway museum at Ravenglass.
The official opening was performed by Antiques Roadshow expert and railway author Paul Atterbury prior to a buffet lunch and a return trip to Dalegarth behind River Irt. The special was, incidentally, driven by David Moseley who was responsible for the manufacture of FR 20’s new chimney back in 1998.
Alan and Alison were to be found at the preserved Kirby Stephen East Station on the Stainmore Railway which was holding a model railway event on Saturday and Sunday. As can be seen from the photo, Alan was in his element in the Station Master’s office where he was able to display his tinplate ‘o’ gauge railway in public for the first time. Appropriately, a Furness Railway train of six-wheeled coaches can be seen rounding the bend on the left hand side of the picture.
Alison occupied herself with the sales stand whilst young Matthew tried his hand at driving a traction engine!
And finally, whilst on the subject of the sales stand, Alison now has a splendid badge of 5643 which can be seen here. They are available at £3.95 each.
John is now sorting out the rotten floor on the last of the door entrances, although he has also indented for a day’s absence this next Wednesday. David has continued his efforts to spruce up the lino on the floor whilst Mike has repaired the last two melamine panels for the servery area by gluing new plywood on to the areas where previous strengthening had rotted. Tim has cut the first of the remaining support wood to be fastened to the frames and this work should continue this next week in preparation for fitting the melamine panels. A trial fit of various components has taken place so there is reasonable confidence that things will go back together in the right order – or are we being too optimistic? Come back Trevor!!!
Mike unscrewed the wooden frame to reveal the mould, in fetching pink.. 
There are also a couple of ‘before and after’ photos to show you what has been achieved.Before:
And after:
And a £700 order for copper tube has arrived (fortunately not at David’s home this time!) to enable Keith to make up the lubrication pipework on the loco.