It has been a busy time again for members of the Furness Railway Trust. Keith and his team have been continuing the job of reassembling the chassis components of Great Western Railway 0-6-2T No. 5643. Keith and Ron are seen here re-fitting the reverser spring.

Keith and Ron re-fitting 5643's reverser spring


Paul has been seconded to the running shed and has spent some time finishing the paintwork on the Ribble Steam Railway’s Mark 1 BSK No. 35128 which is nearing the end of repairs, just in time for Christmas.

Paul Kelly applying gloss black to the west corridor end of BSK 35128


Tim went to the premises of Statfold Engineering last Wednesday to sign off the repairs to the chassis of ‘Austerity’ 0-6-0ST Cumbria, which is due to land back at Preston tomorrow, Wednesday. This photo shows the big ends and eccentric which have received a lot of attention. The sharp eyed will noticed burnt paint marks on three of the eccentric rods, which have been bent to give a better alignment and, hopefully, reduce wear to the white metal on the eccentric straps.

Cumbria's big ends and eccentrics at Statfold


Preparations have been taking place in readiness for Furness Railway locomotive No. 20’s trip to the North Norfolk Railway. The sales team have borrowed the Ribble Steam Railway’s gazebo and are seen testing their abilities to erect it.

The RSR's gazebo being tested


John has completed adjustments to FR 20’s spark arrestor which has been re-fitted.

FR 20’s amended spark arrestor in place


Daniel is seen cleaning the front of the cylinders and steam chest.

Daniel cleaning FR 20’s front end


FR 20 set off to the North Norfolk Railway yesterday afternoon.

FR 20 leaving Preston to go to Norfolk


We are pleased to say that it arrived safely at Sheringham this morning and was moved to the shed at Weybourne. It is due to be in service at the NNR for nine days commencing this weekend 24th and 25th when it will be taking part in the NNR’s Autumn Steam Gala. It will then be operating three round trips
each day during half term week. Needless to say, a number of members are heading off to Norfolk on Thursday to tend to the loco and to operate the sales stand.

FR 20 being unloaded at Sherringham

Monday, 5th October 2026

Well, a long-held secret has recently finally been revealed – Furness Railway
locomotive No. 20 is heading down to the North Norfolk Railway to take part
in the Railway’s Autumn Steam Gala on the 24th and 25th October. It will then
be in service the following seven days (half term week) hauling the NNR’s
vintage train, concluding its stay there on the 1st November. Let’s hope that
the NNR have booked fine weather! Mike Rigg managed to get a photo of the
Railway’s poster recently whilst on holiday in Norfolk.


Back at Preston, the FRT’s Annual General Meeting took place on Tuesday, 9th
September where, after the formalities had been conducted, members enjoyed
the refreshments kindly provided by Alison.

FRT members enjoy Alison's refreshments after the AGM


FR 20’s left hand clack valve made a speedy return journey down to the
premises of South Coast Steam in Dorset for refurbishment after the valve
started to pass over the August Bank Holiday weekend. It was satisfactorily
tested before the loco appeared at the Ribble Steam Railway’s Autumn Steam
Gala on the 26 th September. Thanks go to SCS for their very prompt service.

Work has now started on preparing the locomotive for its trip to Norfolk. This
includes fitting the spark arrestor screens which are being modified by John.
The FRT’s Great Eastern Railway royal saloon had its final scheduled outing of
the year during the RSR’s Gala. It is seen here in Preston Riverside’s bay
platform 0 ready for food and drink to be served.

GER No. % at platform 0 during the RSR's Autumn Steam Gala.



With 5643’s boiler still away for repairs, work continues to rebuild the chassis.
These photos show the buffer beam ready to be lifted into position and then
secured with the buffers attached.

5643's buffer beam ready to be lifted into position
The buffer beam fitted, along with the buffers.


With the paintwork on the Trust’s ‘Austerity’ 0-6-0ST Cumbria’s saddle tank
completed, Jon and Sim have been cleaning up and priming the cab
components.

Jon and Sim working on Cumbria's cab sides.


Having spent much of the summer repairing Cumbria’s ashpan, John has now
turned his attention to the cab roof.

John working on Cumbria's cab roof