We start this week’s blog with a couple of FRT projects which are being undertaken in the RSR’s workshop.
Alan Preston and Jim Hanmer have been busy overhauling Fluff‘s engine.
All the pistons have been removed from the liners and given a good soaking in the component wash bath. It is hoped that this process will release the piston rings which, like everything else on Fluff it seems, have seized.
Alan is seen here with one of the piston rods.
Bill Norcross has been machining out recesses in FR 20’s tender axle bearings in order that they can receive white metal.
Over to the FRT shed where work has continued on cleaning FR 20’s engine frames, and paint has been applied on Wednesday and Friday by Phil Bell, John Dixon, Roger Benbow and a rare visit on Friday from Neil.
Paul Balshaw and Howard have been working on Fluff‘s frames with Phil Bell also turning his hand (excuse the pun) to the handbrake control rod. Outside, John Davis and Keith have been working on Wootton Hall‘s new tender tank whilst Tim and Fred have been painting Caliban‘s wheelsets.
The latter are now turning bright blue with undercoat paint.
Keith has been over to Embsay and reports that a problem with 5643’s vacuum pump has now been identified and fixed and that the loco should be back in traffic this next weekend.
It would be remiss of us not to refer to the step change in train service that took place yesterday on the former Furness Railway. We show a photo of a brand new Class 195 waiting to be ceremonially waved away from Barrow station to Manchester Airport, one of what has doubled to eleven such weekday services that were introduced as part of the timetable change.
Finally, all members should have received an invitation to the Annual General Meeting on the 16th July. Let us know if you haven’t. Also, The Iron Horse has been proof read and is now back with the printer. Hopefully, they will be sent out in the next week.
Work has continued at Preston on the overhaul of FR 20 with further preparation for painting. Phil Bell is seen here cleaning the inside of the frames.
John Dixon (supervised by Ade) has been cleaning the rear running plate around the reverser and also underneath the engine’s drag box and the latter was duly painted with Roger’s help on Friday. Fred and Tim have been cleaning and preparing Caliban‘s wheels for painting.
Various components from Fluff are still receiving attention including the seized clutch control assembly which has been presenting a challenge to Howard.
FR 20’s overhaul continues with Alan carrying out work to reduce the ‘clatter’ from the right hand crosshead. He is seen here removing a burr from the piston rod end. John has continued to clean up components and paint them ready for fitting, including the hornstays whilst Phil Bell has been cleaning the frames and reverser quadrant and Tim has applied gloss Indian Red to the wheels.
Jim Hanmer and Alan Preston have made a prompt start to overhauling Fluff‘s engine in the RSR workshop. Jim is seen here with the engine where all the pistons and liners have been removed.
Extracting the pistons from the liners has proved to be a challenge with something like four tons of force being required to remove the first. The piston rings were found to have seized solid.
The other pistons and liners await their turn.
Paul Bradshaw and Phil Scales have continued their work on Fluff’s frames.
Ade has finally found time away from helping others to apply some gloss paint to Caliban’s frames.
As reported in last week’s blog, the seven wheelsets that were sent away for machining have returned and the photo shows a grand line up outside the FRT shed with the new tender tank for Wootton Hall in the background.
Inside the shed were FR 20’s newly machined tender wheelsets which were being readied for painting.
Wednesday saw Fluff’s engine removed from its frames to the RSR workshop for overhaul. It was a tricky operation in confined spaces so hats off to Alan Vernon who is seen here reversing the fork lift truck back down the shed after the successful lift.
The engine-less frames looked pretty rusty but it wasn’t long before members started to attack the rust ready for preventative paintwork to be applied.
Phil Scales was attacking the rust on the outside of the frames with a needle gun on Wednesday.
Meanwhile Phil Bell was to be seen cleaning FR 20’s motion.
Steve Davies, former director of the National Railway Museum paid us a visit on Wednesday with a Japanese party who are in the process of building a old replica train back in Japan. They had spent the previous day at Embsay and been hauled there by the Trust’s ‘Austerity’ Cumbria.
Keith was busy making up a new piece of plate for Wootton Hall‘s tender tank.
On Friday Bob Thomson was working on a component for Wootton Hall‘s new reverser.
Roger Benbow is seen here continuing his work on painting the crinolines for FR 20.
John Davis is seen here driving out rivets on the shovel plate in the new tender tank for Wootton Hall.
Howard has been measuring up for new axle box lids for Caliban.
Paul Balshaw is seen scraping rust from Fluff‘s frames.
Alison provided us with some leftover cakes a week last Wednesday from the previous night’s Trustees’ meeting, a photo of which we include for Adrian’s benefit(!).
Fluff‘s brake shaft, which controls the brake rods that apply the brake shoes, has been proving difficult to rotate. In short, it has seized up because of lack of use. The application of a 14lb sledge hammer proved to be fruitless so Phil Bell decided that it would be helpful to re-mount the hand brake handle and pedestal to apply pressure and we are pleased to be able to report that this was a success.
The seven wheelsets that were sent away for machining are due to be picked up from Coalville next Wednesday and are likely to be delivered to Preston the following Wednesday. In anticipation of this, John Dixon has been cleaning the underside of FR 20’s tender so that it can be painted before the wheelsets are fitted.
Keith has been cutting up the last portions of the base from Wootton Hall‘s old tender tank….
…. while Fred has been applying black gloss paint to the upper inside parts of the new tender tank….
…. meanwhile, John Davis has been removing rivets from the bottom of the tender tank coal space so that new plate can be fitted….
…. finally, the new water hose connectors for Wootton Hall‘s tender have been made up and await silver soldering of the flanges.
Ade got up bright and early again last Wednesday to put Cumbria over the pit at Preston before putting a small fire in the firebox ready for a test steaming. Alan and Tim then dismantled the left hand piston rod gland and found the metallic packings to have fragmented, confirming this as the cause of a steam leak when the loco was under load. Soft packing material was located and fitted prior to steam being raised to maximum. Tim and then Ade took Cumbria for trips up and down the yard in order to test the new packings and the steam brake before Ade loaded up the spare springs.
Work has again continued on Fluff, FR 20 and Wootton Hall. Fred is seen here painting Wootton Hall‘s tender tank in between heavy showers of rain. News from Leicestershire is that machining work on the wheelsets for Caliban and the tenders for Wootton Hall and FR20 has been completed and arrangements are now being made for their return to Preston. One of the additional tasks undertaken was removing a score from one of the crank pins on Caliban‘s wheels. Jeff at CMS Cepcor kindly sent us this
Today saw Cumbria loaded and despatched to Embsay where it will join the Trust’s GWR 0-6-2T No. 5643.
We show here a photo of 5643 double heading with Illingworth, also a recent temporary resident at Preston, courtesy of the Embsay Locomotive Department Facebook page.
Ade and Mike set about moving 0-4-0DM Fluff last Wednesday afternoon in order to position it over the pit. Stanlow was brought around from the running shed and, after a complicated set of moves, Caliban‘s boiler was moved out of the shed and then Fluff took its place.
This should enable the engine to be lifted for overhaul.
As ever, Keith has been busy with Wootton Hall and is seen here measuring up the cab.
Finally we cannot go without resolving the mystery photo from 7 days ago!
Ade got himself out of bed at an early hour to light up Cumbria (thank you, Ade) so that it could undergo a pre-hire inspection in steam by Tony Wright of the Embsay & Bolton Abbey Steam Railway. All went well and Cumbria then went on to appear at the RSR’s Spring Steam Gala on Saturday and Sunday. It is seen here being prepared on Sunday morning and also at the head of the 11.30 train from Riverside station on Saturday with Hudswell Clarke 0-6-0ST No. 1208 Illingworth (also bound for Embsay in the near future) on the rear.
John Dixon has been measuring up one of Wootton Hall‘s tender axleboxes so that he can make a pattern for a casting to repair some damage.
John Davis has been spending more time working on Wootton Hall‘s new tender tank.
Tim has again been cleaning up FR 20’s frames whilst Roger Benbow set to work on cleaning up the crinolines for FR 20’s boiler.
Work has also continued on Fowler 0-4-0DM Fluff where a replacement running board support, fabricated by John Stewart, has been fitted.
Over at Embsay, 5643 has been busy turning its wheels again and we have an Instagram photo here of it on a dining train there.
Also, Mike Rigg has submitted a mystery photo for you identify. Answer next week.
Work at Preston last Wednesday concentrated on following up issues brought to light from the test steaming of Cumbria two days earlier. Alan is seen here peering into the fireman’s side clackbox to try and identify the cause of a small steam pass.
Finally, outside the shed, work has continued on cleaning off and painting of Wootton Hall‘s recently purchased tender tank. In action on this are Phil Scales and John Davis (above) and Ed Tatham (below).