The Trustees met last Tuesday evening at Over Kellett to sign the shed lease and consider David’s cash flow statement – as many of you will be aware, there has been a significant outflow of money in recent weeks in order to progress the Trust’s projects! Attendance at the meeting was reduced due to the poor weather forecast but was just sufficient to be quorate and to transact the business. With the weather in mind, Alison’s sandwiches were duly eaten during the meeting to save time and all was done and dusted before 9.30 -this must be some sort of record! Opening the front door revealed an unwelcome layer of snow that had arrived while the meeting was underway, and those heading back towards Furness had to endure a blizzard.
The cold weather put paid to any thoughts of undertaking a washout on FR 20’s boiler on Wednesday and so efforts were turned to removing Caliban‘s front buffers in readiness for the cylinders to be re-bored.
The new tubes for FR 20’s boiler arrived late in the day and can be seen in this artistic photo taken by Ade of Alan inspecting the tubes viewed through the fork lift’s mechanism. (Suspect he just couldn’t be bothered to get off the fork lift! Ed.)
Cumbria‘s dome cover and dome lid were removed on Friday morning in readiness for the regulator and ‘J’ pipe to be removed for machining. John Dixon is seen here replacing one of the studs.
Fred spent much of the day finishing the cleaning up of FR 20’s tender wheels…
… then John Dixon applied a coat of red oxide paint.
Roger continued Phil’s efforts at cleaning FR 20’s brasswork and can be seen here busy at his work.
Keith has been working on the new keeps for Wootton Hall’s tender, and is seen here fitting one to one of the axleboxes.
And there was yet more work carried out by John Davis and Howard on Fluff.
Firstly, as predicted, Cumbria arrived back at Preston last Monday and was tucked into the top of road three in the FRT shed ready for attention.
Work has continued on FR 20 with the first of the Indian Red gloss paint being applied to the engine’s wheelsets. This is literally a rolling programme as the engine will need to be rolled forwards or backwards for all areas of the wheels to be so decorated! All the copper pipework has been cleaned up ready for annealing to take place and further cleaning and polishing work has been carried out on the brass that fits to the front and back of the firebox. The steam cleaning of the tender wheelsets has been completed and they have been given a further hand clean in readiness for paint to be applied. Finally, new tubes have been ordered and a cheque despatched; the tubes should appear in the next couple of weeks. Meanwhile, with the all the old tubes now removed, a washout is planned for Wednesday, subject to a shunt being arranged and the pressure washer playing ball. With the formal NDT report now received, it should then be time to call in the boiler surveyor.
Progress has also been made on Wootton Hall where brass edging to the cab side can now be seen in place. A start has also been made on bringing together the components for the brake gear so that it can be assembled on the tender.
We start with the news that a milestone in the restoration of the FRT’s ‘Hall’ class 4-6-0 locomotive No. 4979 Wootton Hall was reached on Thursday when the riveting gang fitted the last rivet to the re-built tender frames. The front of the tender frames had been severely wasted by years of water and coal dust which had cascaded down from the cab floor. As followers of this blog will know, the riveting team of Matt Jervis, Keith Brewer, John Dixon and Chris Rycroft have been meeting regularly on Thursdays over the last few months and have been responsible for completing the fitting of several hundred rivets which have locked together the new steelwork with the old. The final day saw 30 rivets fitted, which is quite an effort! Well done to all!
John is seen preparing the gas torch to heat up the rivets.
Keith is pictured holding the final hot rivet in place.
And Matt Jervis applies the force to finish the job.
Staying with the Hall’s tender, and Alan Middleton is seen on Wednesday with the newly arrived second hand 4,000 gallon Collett tender tank recently arrived from Tyseley.
As you will see here, it didn’t take long for Keith to set to with a cutting disc to remove the corroded shoveling plate. This will also enable scale to be removed from the tender tank.
Onto other projects, and the axleboxes have been removed from FR 20’s tender wheelsets and cleaned. The wheelsets have received some attention from scrapers to remove twenty years of grime and the first set is seen here being steam cleaned by Matt Bedford.
Andy Booth has completed the removal of the tubes from FR 20’s boiler and they were cut in half by John Davis before being placed in the scrap metal skip.
There was a visit to Embsay on Saturday by Keith, Fred and Mike. Fred and Mike cleaned below the running plate on 5643 whilst Keith attacked the inside motion. Both 5643 and Cumbria were drawn outside the shed to allow the water to be drained from the boilers and for Cumbria’s spare springs to be loaded.
There was then time to polish up the bright work.
This marked the end of regular loco-hauled services along the Cumbrian Coast. The Class 37 diagrams are now covered by Class 156 diesel multiple units, themselves now around thirty years old.
Work has continued apace on the overhaul of FR 20, with Alan seen here prising off the front right hand cylinder cover. Both covers were removed with assistance from Ade and, at first sight, it looks as if new pistons rings will be required. Tim has since located the spare set that was ordered over twenty years ago.
Cleaning and painting of the engine’s wheels has also continued with a primer/undercoat of red oxide being visible here.
John Dixon has been cleaning up the toolbox that is usually located on the running board to the right of the smoke box.
The decision was taken to lift the tender to get the axle journals skimmed and polished as these had given some problems in times past. Ade is seen here moving the tender to the unloading road after a massive shunt on the 2nd January. Well done Ade!
Work has also continued on cleaning up Fluff‘s frames and bodywork over the Christmas period and John Davis is seen here at work with Mike Rigg.
Keith has, as ever, been working on Wootton Hall and the left hand ‘Collett style’ cab side is seen here mounted temporarily.
After eight days of playing Christmas songs on the RSR’s Santa Specials before Christmas you would have thought that Alan and Tim would have wanted a rest, but they are seen here with George and Pete performing a successful Live Steam gig at the Engine Inn at Cark-in-Cartmel on New Year’s Eve.
Friday, 4th January brought the good news that FR 20’s boiler and the three Hall tender wheelsets had passed Jim Kennedy’s NDT examination. Jim is seen here at work on the boiler.
The axleboxes were transferred over to the FRT shed so that the components can be cleaned up. This was an opportunity to use the previously untested parts washer that had been generously donated to the FRT some while ago. After studious reading of the instructions (that’s unusual!) Keith Brewer watches on as John Dixon cleans the axlebox covers.
Late afternoon the newly purchased Collett tender tank arrived from Tyseley.
After some time manoeuvring of the low loader and crane into position, the tank was successfully lifted on to pallets alongside the FRT shed. The photo below shows a winter’s evening scene at Preston as preparations are made for the lift.
Keith is seen here opening another early birthday present on Wednesday when a set of newly cast axlebox underkeeps and brasses appeared in a delivery from the Severn Valley Railway.
The axlebox underkeeps are indeed fine castings with no signs of corrective fettling, as can be seen here.
On the departure side, Adrian is seen here placing on to the delivery lorry a set of six springs from Wootton Hall‘s tender which are to be overhauled after over fifty years out of use. Two spare springs are to be manufactured at the same time.
And talking of Wootton Hall, Keith is seen here temporarily fitting the right hand cab side in order to take measurements for boiler cladding and other fittings.
Another view here with the cab side number plate fitted completely alters the appearance of the loco and shows signs of things to come!
The main job on Wednesday was to jack up FR 20’s boiler to allow easier access from under the firebox. The front of the boiler is now positioned on steel stands.
Much of volunteers’ time this week has been spent on the very basic but important task of cleaning up the motion, frames and boiler of Furness Railway No. 20. An undoubtedly dirty and sometimes very uncomfortable task, this type of work is sometimes inevitable during the day to day work of servicing and overhauling our locomotive fleet. However, if the load is spread, as in this case, it doesn’t become too much of a burden on any one particular person and we are pleased to report that Mike, John Dixon, John Davis, Paul Balshaw, Tim, Roger and Fred have all buckled down to the job with the result that it has progressed extremely well. Hopefully we will soon be in a position whereby can move on to other more satisfying work!

Meanwhile, more progress has been made on the upper platework for the tender frames and the test fitting of components.
Keith has also been sizing up the position of the reverser stand on the loco frames so that other steelwork can be arranged around it.
Jim is seen herein festive mood.
Headline news for this week has been the arrival at Preston of the main components for former Furness Railway 0-4-0 No. 25, more recently known as Barrow Haematite Iron & Steel Co. 0-4-0ST No. 17.
Fortunately, all the planning and preparation paid off and the locomotive’s parts were safely offloaded from Martyn Soames low loader by a road crane and then secured on to the CCT frames.
The CCT was subsequently, on Thursday, moved around to stand outside the FRT’s shed, forming a queue for attention no doubt!
In the meantime, work has continued to clean FR 20’s frames, wheels and motion on both Wednesday and Friday. Fred has now finished wire brushing the firebox and has made a good start on the boiler.
One of Cumbria‘s clack boxes has been brought back from Embsay and John Dixon has spent some time making a box so that it can be despatched for repair.
John Dixon has carried on and completed the work of demolishing the body of the CCT.
This left only the task of disposing of the wood, which seemed to take a lot of labour – or perhaps it was just a case of people wanting to gather around a warm fire on a cold day!
Adrian did what he does best on Wednesday and started the job of dismantling the cylinder covers on FR 20.
Roger and Tim have been cleaning the motion and running plate whilst Alan has been inspecting the loco for the jobs that need to be done.
Fred has again been patiently cleaning down the exterior of FR 20’s firebox in order for it to be subjected to non destructive testing.
There was yet another riveting session on Thursday when another 50 or so rivets were inserted into the tender frames.
It is reckoned that there are now less that 100 more rivets to be added before the tender is finished and a start can be made on the engine’s drag box. We suspect that Matt Gervis is hoping for a Christmas break before the latter is attempted to let his shoulder recover! Keith is seen here drilling yet another hole ready for a rivet.
The job of removing the cantrails from GER No. 5 has continued and is now on the last lap. It appears that the north side cantrail has yielded rather more swiftly to John Davis’s attentions.
Live Steam had a busy weekend playing three gigs in less than 24 hours during the Dickensian Festival at Ulverston. After another successful night at the Old Friends inn on Saturday evening, they went on to entertain the residents at Abbeyfield House after lunch on Sunday.
Tim took advantage of an Alan Middleton solo to join the residents and try out the comfy chairs – Alison reckons that he settled in very well and has threatened to make him a reservation for the future!
The band then went out in the cold to provide the Festival Finale on the Theatre Street stage later in the afternoon, attracting a good crowd in the process. This rather belied the rumour that they are always put on last to make sure that everyone goes home!
Another big shunt took place at Preston last Wednesday which saw FR 20’s frames being placed in the unheated part of the FRT shed. Tim spent some time wire brushing the inside of the firebox while Alan went for the cleaner task of removing the external expansion brackets.
Outside, at the end of Wednesday John Dixon had nearly finished the task of dismantling the body on the PMV, which will then be used to accommodate the frames of FR 25 on arrival.
There was a productive shunt last Wednesday when FR 20’s boiler was moved into the FRT shed to enable work to commence under cover. At the same time it was possible to release Caliban‘s wheels which were moved out by hand, with Ed Tatham and Alan Middleton seen here with the driving set. Thanks to Phil, Matt B and Ade who moved the stock around to make it all happen.
John Davis and Paul Balshaw spent more time this week in their efforts to release more of the south side cantrail on GER 5 while Paul Newton continued work on the L&NWR platform seat.
John Dixon and Ed spent time on Wednesday dismantling the body on the PMV.
Howard, Alan Ogden and Mike Rigg concentrated their efforts on Fluff, with Mike seen here trying to remove a stubborn piece of the cab footplate.
Fred was back at Preston on Friday with Roger and brought back from Embsay the high pressure water pump which was suffering from wobbly wheels! Roger set about making the necessary repairs and then subsequently also repaired the fan in the mess room which had disintegrated the previous week.
There was a further riveting session last Thursday although the absence of Matt G reduced the number of rivets fitted. There will be another session next Thursday. Keith is seen here fitting a step retaining bracket on the tender frames.
And finally, outside the FRT shed, Bill Croston’s new mural has been erected alongside the new children’s playground.