We start this week’s blog with the sad news that Chris Mills, a long standing director of the Ribble Steam Railway, who also joined the FRT in recent years, passed away yesterday morning after a long and determined fight against illness. Chris, despite his health problems, remained a larger than life character who took on the duties of membership administration when Peter Sinclair retired in addition to his role as editor of The Ribble Pilot and administrator of the RSR’s web site. Chris was also in close touch with the media and arranged advertising for special events. He will be very much missed at Preston and our thoughts go out to his wife, Sonja, and Chris’s family.
Furness Railway No. 20 made a return to steam at the RSR over the Bank Holiday weekend, operating successfully over the Saturday, Sunday and Monday. The tender had been lowered back on to its rear wheelset the previous Wednesday after attention to the rear right axlebox. We are pleased to report that the axlebox showed a significant improvement in performance and, whilst still warming up over a period of time, was nothing like as bad as had been experienced at Shildon during FR 20’s latter steamings there. No doubt the axlebox will get further attention during the locomotive’s forthcoming overhaul.
A Facebook Live was filmed on the footplate of FR 20 that day, which was broadcast “live” on our Facebook page, to record the complete run along the length of the RSR. This has proved to be extremely popular – it’s been shared 90 times and been seen by more than 6000 people. If you haven’t watched it yet, it’s here..
News of the generous donation of former Furness Railway No. 25 aka Barrow Haematite Steel Company No. 17 to the FRT by the Executors of the late Bert Hitchen’s estate is now in the public arena and we have had a very positive reaction. Both Steam Railway and Railway Magazine sent their congratulations and the view that the FRT was the right and proper custodian of this locomotive, and similar views have been expressed over on our Facebook page.
Visits have been made to Carnforth by Alan, Keith and John Dixon over the last two Thursdays in order to retrieve the smaller components of 25/17. A further visit is planned for this next Thursday after which a plan will made to bring the frames, cab and wheels to Preston.

Work has continued on the FRT’s projects, including the sanding down of Great Eastern Railway Royal Saloon No. 5. John Davis and Paul Newton are seen here hard at work.
We conclude by having to report that the end may well be nigh for FRT Campervan No.1 which, as we reported a few weeks ago, suffered a clutch failure on the A66 whilst returning from Shildon. Unfortunately, it also suffered a more terminal brake failure whilst being manoeuvred at the garage, where it had been towed for repair. It appears that it came off worse when the front of it ran into a wall! Still, Alan reckons that he got his money’s worth out of it over the last nine years.
As mentioned in last week’s blog, the main task at this last Wednesday’s working party was the jacking up of FR 20’s tender to attend to an axlebox which had been showing signs of warming up during the latter days of its operation at Locomotion, Shildon. Once the axlebox had been dismantled it became clear that both the bearing and the journal had, for some reason, become scored. Also, the bearing had become too good a fit, not enabling oil to circulate and lubricate the interface between bearing and journal.
Alan, meanwhile, took the bearing aside to remove some of the brass in order to give some more lead towards the top of the bearing, so allowing more oil to circulate.
The oil pad showed signs of wear to the rivets, which suggested that these had come into contact with the journal. Some horsehair was retrieved from store with a view to substituting this instead of the oil pad when the axlebox is reassembled. The engine, incidentally, already has horsehair in its axleboxes and this seems to have worked well in the past. All being well, FR 20’s tender will be back on its feet on Wednesday and it is proposed that it will be in service on the RSR over the Bank Holiday weekend.
Work also progressed on Caliban where a further spring hanger has been freed off, much against its will. Only another five to go! Howard is seen here tackling the next one.
Keith has been making the most of his retirement, as can be seen from this photo of new steelwork between Wootton Hall‘s tender frames.
Meanwhile, Tim, Paul Newton and John Davis continued the job of sanding down Great Eastern Railway Royal Saloon No. 5 whilst John Dixon filled and sanded down the various cracks in the teak panels.
The job continued on Friday when Fred and Roger joined Paul and the two Johns, with the task now well on the way to completion.
That’s just as well for the work really does take it toll, numbing both fingers and mind!
We forgot last week to congratulate Keith on his retirement from his job with Ribble Rail on the 4th May. Needless to say, Keith is making the most of his new found leisure time to progress the tender frames for Wootton Hall. He is seen here drilling a brace section that will support the vacuum cylinder.
This last weekend saw Furness Railway No. 20’s last three days of operation at Locomotion, Shildon before returning to Preston this week in readiness for its ten year boiler overhaul.
Locomotion had arranged a Festival of Steam, which included the first appearance of replacement locomotive, RS&H 0-4-0ST Eustace Forth plus some road steam engines.
That Sentinel steam lorry was certainly an impressive beast! John and Jean Dixon, Sam Middleton and Keith Brewer visited on Sunday to enjoy the sunshine and steam.
Alan and Tim had their photo taken with two young ladies from the Same Difference Arts who were performing street theatre in Steam Punk attire.
FR 20 ran the last three hours on Monday on its own, with a pause at 15.30 to enable the NRM’s Anthony Coulls to make a lovely speech on behalf of Locomotion to mark the nine years that FR 20 had been based there. There then followed the cutting of two large cakes before staff and volunteers boarded the train, along with visitors, for the final two departures of the day. Needless to say, there was some loud whistling from the locomotive on the final journey (by guess who) followed by some goodbyes from Alan, Alison and Tim to the Locomotion family of staff and volunteers, some of whom had turned up on Monday to have a last go on the regulator. All in all, a fitting if not rather nostalgic occasion. Hopefully, FR 20 will be back in the not too distant future.
Work has continued at Preston on sanding down the weathered sections of woodwork on GER Royal Saloon No.5, although fingers are now becoming rather numb from the effort! The worse side has now been tackled so a start has been made on one of the ends. The second side should just require a light sand to allow new varnish to key to the existing varnished surface. John Dixon and John Davis are seen here in synchronised sanding action.
Adrian made a welcome return on Wednesday after a visit to works for repairs and is seen here giving moral support to Howard as he battles with the dismantling of Caliban‘s springs.
David Rimmer joined in the action on Saturday and a second spring has now been removed.
Mike Rigg spent most of Wednesday in the mess room, assisted by David, stuffing envelopes with GDPR correspondence, which should now have landed with members – in fact two consent forms were already back through the post on Friday, even though second class post had been used in both directions. If you haven’t already done so, please return the consent forms as quickly as possible so that the FRT can remain in full contact with you.
And we leave you with a view of progress on Wootton Hall‘s tender frames, which are now gaining additional metal following the recent completion of the welding work on the side plates.
Work started on Wednesday on the refresh of the FRT’s Great Eastern Railway Royal Saloon No. 5. The coach had, as planned, been shunted into the heated part of the shed after the RSR’s TPO coach had been moved round into the museum.
Time was taken to re-familiarise with the saloon and to identify work to be done. Whilst Tim cleaned up the shed floor to remove dust and the like from the TPO overhaul, others started to move around the chairs in coach in order to hoover and tidy up one of the carpets. It would be a nice idea to replace all the carpets with something more suited to a Royal saloon, but we will have to weigh up the costs! The upholstery also needs some considerable attention and again it will be necessary to get some quotes for upgrading it.
In the meantime, it was decided to attend to the exterior of the saloon. Some of the varnish had begun to peel, particularly on the north side of the vehicle as it stands now – the adjacent photo illustrates the problem.
A test area was sanded down by Mike, both Pauls and John Davis before Tim applied some gold size, which brought the colour back to the teak. Roger Benbow, John, Paul Newton and Mike continued the task on Friday. The south side of the vehicle isn’t too bad, but will benefit from some more coats of varnish in due time.
The RSR’s TPO spent its last week in the FRT’s shed as Mike (above) and Paul (below) fitted the brush strips alongside the sliding doors and John Dixon cleaned the windows and touched up some of the paintwork. 
It It is planned that the TPO coach will be moved out of the shed today and replaced by the Great Eastern Railway Royal Saloon No. 5 which will need a little TLC to its upholstery and exterior varnish after being in use at Beamish for eight years. And, of course, there are still some jobs that we never finished off in the first place!
Chris Rycroft and Howard Fletcher are seen here between Caliban‘s frames last Wednesday manoeuvring a jack hammer into position in order to try and remove another of the very stubborn spring hanger pins. One pin was removed on Wednesday but it looks as if it will be necessary to drill out the other pins, which will no doubt take some considerable time and effort.
Outside the shed, tarmac was laid on Friday in preparation for the creation of the Ribble Steam Railway’s new children’s playground.
John and Fred were on the mess room roof in order to fix a new outside aerial, and the completed tarmac and aerial can be seen here.
Inside the mess room John has fitted a much needed new towel rail.
Cumbria arrived at Embsay as scheduled last Thursday and was pressed into traffic straight away on Saturday and Sunday. Alan and Tim each went for a footplate ride on the old ‘Red Rocket’ on Saturday and proclaimed that it was good to see it back in action closer to home. Cumbria is seen here at Embsay on Saturday ready to depart with the 13.30 train to Bolton Abbey.
Also seen here at Embsay are the new small boiler tubes for 5643 which had arrived and are now waiting to be fitted by Andy Booth.
The people from PPS Graphics from nearby Anchorage Business Park turned up as scheduled on Wednesday morning and, with Tim’s assistance, applied the fantastic graphics to the bodysides of the TPO.
The TPO coach is seen here after varnishing had been completed.
The paintwork on the RSR’s TPO is almost complete following the working parties on Wednesday and Friday.
The yellow stripes along the lower panels of the body were added as was the orange electrical warning line on the gutter edges.
The painting of the bogies was completed on Friday with Roger adding the final touches of colour before he disappears on holiday. The vinyls should be added on Wednesday followed by a final coat of varnish on Friday.
We are pleased to be able to report that Ade should now be back at home after going under the knife during a four hour operation on Thursday. He tells us that the hospital food was OK but that he couldn’t find the mini-bar! He is still feeling rather sore and reckons that it will be a little while before he will be able to continue his efforts to dismantle Caliban‘s springs.
Finally, in the mess room, Fred brought in an inside aerial to try out on the TV but was unable to get much of a picture with it. It looks as if we will have to invest in a proper outdoor aerial sometime.
The photo shows the coach in Royal Mail red masked up ready to receive the yellow stripes along the lower panels. As can be seen from the shining bogies, Fred, Roger and John Davis have also been hard at work down below. It is planned that the vinyl Travelling Post Office lettering will be applied to the body sides next Wednesday, after which a finishing coat of varnish is scheduled for the Friday. It shouldn’t be too long after that before the coach is transferred into the museum.
Ade and Howard have finally managed to release the first of Caliban‘s spring hangers, where the steel pins are proving to be well and truly seized up. Howard is seen here attempting to remove the second of the spring hangers. Howard is also looking to call in reinforcements as chief dismantler Adrian is due to go under the knife in Preston Royal Infirmary tomorrow so will be on light duties for a while after that. Good luck Ade!
Keith continues to be on the look out for components for Wootton Hall and has been fortunate to obtain a second hand clack valve courtesy of Andy Booth. Please see Keith if you would like to contribute to the purchase of this or the two new snifting valve castings which were mentioned in last week’s blog.
Keith has also been fabricating two plates to cover the cylinders on Wootton Hall, one of which is seen in position here.
As mentioned in last week’s blog, the Ribble Steam Railway’s Spring Steam Gala took place on Saturday and Sunday with four locomotives in operation, including visiting Hudswell Clarke 0-6-0T Gothenburg from the East Lancashire Railway which is seen here departing from Riverside station with the first train on Saturday.
The Gala marked the introduction into service of the FRT’s former RMB buffet car No. 1812, which was placed in the centre of the three coach rake, and very smart it looked. Draught beer has been re-installed to the bar and Brent is seen here drawing off the first drink of the day.

John Dixon is pictured here in the process of applying gloss paint on Saturday and it is planned to put on another gloss coat on Wednesday, so a dust curfew is required in the shed for that day. John Davis, Fred and Roger have been continuing their task of painting the frames and bogies and are nearly at an end with this part of the project. Paul Balshaw has been attending to the missing rubbing plates on one of the corridor connections.