We start this week’s blog with the sad news that FRT member and RSR Board member Dave Manley died last Tuesday morning after a three year fight against cancer. Dave had been a key member of the Ribble team at Preston and could often be found driving the mobile plant to top up coal with the JCB, receive materials with the fork lift or move earth with the dumper truck. He was always helpful to us when there was a need to get things done and he will be very much missed by us all. The funeral will be at Crewe Crematorium on Friday, 7th September at 15.20, with donations to the Macmillan Nurses.

Work continued last week on the job of dismantling FR 20 with John and Tim spending most of their time on the job on both Wednesday and Friday. Neil came in on Saturday to clean the footplate around the reverser quadrant.
Tim also managed to carry out some paintwork round the mess cabin door on Wednesday but was then thwarted by the weather.
Adrian and Howard have continued their work on Caliban and Fred and Roger appeared on Friday to clean up the insides of the wheels, which had been released from under the frames the previous Wednesday.
There was some considerable disappointment at Embsay on Friday when there were difficulties in raising the required pressure on 5643 and Keith returned there on Saturday and today to try and effect remedial work on the loco. The cause of the problem was a steam leak around the regulator box and this has been removed and brought back to Preston to be machined, hopefully on Wednesday.
And finally, the Friendly Engines event on the RSR over the Bank Holiday weekend was augmented by some model railways to keep visitors entertained. The weekend was deemed to be a success with visitor numbers higher than last year on all three days. Alan is seen here happily operating his three rail O gauge train set.
Alan and Tim went over to Embsay on Wednesday to examine Cumbria‘s regulator valve which was still passing large amounts of steam when supposedly shut. After much deliberation and wrestling with the valve it was concluded that there was still work to do to improve the seal between the valve faces.
Also at Embsay was Russell Walker, who appeared with daughter Chloe and an Atkinson’s low loader to take Stephen Middleton’s 1916-built Hudswell Clarke 0-6-0ST Illingworth to Preston for attention to a hot right hand driving axle box, and then a booked appearance at the RSR’s Steam Gala at the end of September.
Ade had a very productive day on Wednesday, jacking Caliban further up in the air to allow both wheelsets to be rolled out from under the frames in readiness for machining of its journals. A key milestone in the project has been achieved so congratulations, Ade!
And so to Saturday when there was an early start to enable Russell Walker to operate the crane to lift off FR 20’s chimney and dome cover before he set off for the control tower for the day. Alan, John, Tim and Sam spent the rest of the day dismantling and labelling pipework and cab fittings from FR 20 ready for cleaning and storage.
John is seen here removing excess thread from the dome studs in readiness for it to be lifted off also with the return of Russell at the end of the day.
With Howard (seen here cleaning one of Caliban’s axleboxes), David, Alison, Matthew, Derek and Neil (crewing Linda) also on site it was a good turnout of members.
FR 20 was shunted out of the RSR’s running shed last Wednesday to enable the wheels to be power washed after having been coated with Jizer degreasing fluid. Although quite a time consuming process, the results so far have been heartening. The key issue was the need to avoid soaking those members who were also intent on removing components from the loco at the same time! John Davis is seen here with the power washer.
Alan Middleton was one of those dodging the pressure washer to remove some pipework.
John Dixon spent some more time on repairs to the step boards on GER No. 5 and is seen here planing down the new wood inserts.
Fred and Tim started the process of cleaning up the components removed from the loco before they are placed in store, with Fred here cleaning one of the injector steam valve handles.
Alan returned home from a short break away the previous weekend with a set of drain cock castings and coupling rod half bearing castings for FR 25 that he had picked up from Steve Andrews.
These had been ordered by Bert Hitchen before his untimely death but we are now in a position to unite them with the loco.
Further to this, Tim paid a visit to Crewe on Thursday to pick up the two safety valves for FR 25 from L&NWR where they had been found sitting on the shelves in the store. They were certainly too heavy for the luggage rack on the train journey home!
Also last Thursday, Keith, John Dixon and Matt Gervis had a productive day fitting more rivets on Wootton Hall’s tender frames.
Headline news has been the arrival at Preston last Wednesday of FR 25’s boiler, albeit as a kit of parts. Tim received news by email of the need to move the boiler from Stockton whilst he was out of telephone contact on holiday in Cornwall. It took three journeys to the top of the local hill to get reception and organise the move, which was done with great help from Jacqueline at Northern Steam Engineering who made the arrangement for a hi-ab to transport the components as a crane could not be guaranteed to be present at Preston. In the end, the boiler was loaded a day early last Tuesday and so made an early arrival at Preston on the Wednesday morning. Fortunately, the former Furness Railway bogie bolster had already been shunted into position and the hi-ab departed back off to the north east at 10.45.
The other components were placed in the car park and will need to be moved this next Wednesday.
During the ensuing shunt moves there was a rare sight captured with FR 20, the FR bogie bolster and two boilers which have adorned ex Furness Railway locos.
Work has started on the overhaul of FR 20, with the ceremonial draining of the water from the boiler on the Wednesday the 18th July.
Last Friday Tim started the job of cleaning down the driving wheels and John Davis commenced the task of de-scaling the coal space in the tender.
Fred also took the opportunity to reprise his role as principal cleaner of FR 20’s smokebox!
John Dixon has continued to undertake woodwork repairs to the Great Eastern Royal Saloon and is seen here repairing one of the step boards.
Keith has made more progress with Wootton Hall‘s tender and has been fettling up the recently shot blasted tender hanging plates.
There has been more riveting of the tender frames and Keith is seen here pondering the next move in the restoration.
The RSR’s Sentinel 0-4-0 Enterprise, which is in the museum as part of the Sentinel display, has received a wrap depicting events over the last 50 years.
The boiler for Hunslet 0-6-0ST Glasshoughton No. 4 arrived back from Llangollen last Wednesday.
Finally, an impressive 100ft long model tram layout returned to the RSR this last weekend and Tim is seen here doing some moonlighting, driving trams in between driving the steam service yesterday!
Adrian can be seen here starting the process of applying red oxide to the cleaned up cab.
Meanwhile Alan seemed pleased with the results of the shotblasting.
Fred and Roger finished the job on Friday, but not before the cab had unfortunately been sprayed with the first rain in weeks!
The shotblasters should be returning this Wednesday to tackle the cab roof and also another cab that does not belong to the FRT.
Saturday was a little quiet (something to do with a football game!), but plenty of people, including many members and friends, came along to say “Goodbye” on Sunday. Coincidentally, Neil was able to spend his first full day on the footplate at Preston that day as he looks to regain his fireman’s ticket – at least he had a loco that he knew from times past.
Sadly, after handling the train service and rake of three coaches without fuss, FR 20 retired to the shed at the end of service on Sunday afternoon in steam for the last time for a while. As Tim put it at this point: “finish with engines”. We know from the large amount interest on the internet that everyone is willing the FRT to get the loco back in traffic as soon as feasibly possible.
John is seen here cleaning out a droplight sill prior to reassembling it. Roger has started the job of sanding down and priming parts of the buffers and couplings.
Keith has brought back some of 5643’s components from Embsay for fettling and Fred is seen here on Friday cleaning up the regulator quadrant. Keith was due to go over to Embsay on Sunday as he looks to get 5643 back in steam as quickly as possible.
In the meantime, Keith has been lining up Wootton Hall‘s tender axleboxes with the overhauled tender frames, seen here at work. A further riveting session is planned for Thursday.
Alan Ogden has once again been tackling the instruments and smaller electrical items on Fluff and is seen here with a refurbished switch box.
Ade, Alan and Howard have been hard at it in their efforts to remove the final spring hanger pin on Caliban‘s frames. Suffice to say that plan Z didn’t produce immediate results, but lots of sweat and toil were duly expended and victory was eventually achieved.
It is pleasing to be able to report that the riveting session on Wootton Hall the previous Thursday had seen approximately 50 rivets installed, and evidence of a neat job is seen in this photo of a newly riveted bracket on the front portion of the frames.
Backing plates for the tender cab steps have also been bent to shape.
And a newly fabricated and shaped plate is seen here on the frames in front of the boiler.
Alan, Tim and Pete Skellon successfully made it to the Bolton Station Community Gala on Saturday and, would you believe it, played railway songs in the bus interchange for half an hour! Must have been rail replacement songs! Both Alan and Pete had been disorganised in forgetting to take their mobile phones with them, but between you and us Alan also forgot to take a set of teeth – but we won’t tell anyone, will we?
Ade failed to score with Caliban‘s last spring hanger pin last Wednesday and is now looking for a plan Z for this week. We will, as ever, keep you posted.
There is more varnish on GER No. 5 with still plenty more to apply once John Dixon has finished filling in all the remaining cracks in the woodwork. Meanwhile Mike and Paul Newton have been working on a plan to create a replica works plate for Rachel, Ken Nuttall’s petrol Simplex at Haverthwaite, for Roger who has been working on it for some time now.
John Dixon has been moving around the Great Eastern Railway Royal Saloon No. 5 filling in cracks on the teak panels whilst Mike Rigg has repaired one of the window frames.
Tim has continued the task of applying gold size and a first coat of varnish, which has been completed on the north side and east end.
Adrian spent Wednesday trying to drill out the last remaining spring hanger pin on Caliban, but to no avail so far. So plan B is for next Wednesday, although Ade hasn’t yet told us what that may be.
Howard has been trying to release the retaining screws on top of the spring hangers and he is seen here with David applying plenty of pressure on a stubborn screw.
Meanwhile Keith has been doing some more drilling on Wootton Hall‘s tender frames and is expecting Matt Gervis to appear on Thursday to start fitting some rivets. The NDT man is also expected this week to test the tender axles.
Outside the shed John Davis has been painting the mess room roof and, with the assistance of Fred, the outside is looking much cleaner in readiness for painting.
A 1949 Duple bodied Bedford made an appearance for the RSR’s Beer and Cider Festival over the weekend, but unfortunately Owd Sue, as she is known, succumbed fairy early in the proceedings owing to the failure of a lift pump. A replacement bus was supplied very promptly by Coastal Coaches.
Finally, we include a photo taken on the 27th May of Alison with one of her cream teas.
In the workshop there was a marked step forward on the (not so) mini project to remove the remaining extremely stubborn spring hanger pins from Caliban‘s frames. A further four pins were removed with the aid of an air powered hammer. Ade and David Starkie are seen here in action. Unfortunately, the air compressor sprang an oil leak and one pin, which has so far shown not one iota of movement, is still left to be extracted.
Sanding of the exterior woodwork of the Royal Saloon GER No. 5 has been completed and John Dixon is working his way around the coach with the wood filler. Tim has therefore been able to start the process of applying gold size, the effect of which can be seen by the accompanying photo, where the upper panels have received the gold size. Almost the whole of the north side of the vehicle has now been treated and more progress is anticipated this next week.
Outside the shed, there has been good progress on preparing the exterior of the mess room for painting. Fred had started the job the previous week and Paul Newton and John Davis are seen here on the roof applying the full force of the power washer. More red oxide on the exterior had appeared by the weekend and it is hoped to be able to continue this progress whilst the weather holds fair.