There is plenty of news this week.
Firstly there has been some very welcome success at Embsay to report. Keith and Ade went there on Wednesday to re-fit the regulator box using a specially prepared copper gasket following the previous failure of a graphite foil gasket. Keith and Fred then went to Embsay on Saturday and, with the assistance of staff there, fitted the superheater elements and lit a warming fire. Keith was back there again on Sunday morning with steam successfully raised to working pressure. There is just one further piece of work to do to correct one of the safety valves which is lifting light which Keith will attend to on Tuesday. A formal steam test can then be arranged to take place in the presence of the boiler surveyor.
Keith also brought back Cumbria‘s fireman’s side injector from Embsay to Preston for attention.
Bill Norton is seen here preparing to machine the joint face which had developed some unevenness on the surface which, together with some pitting on the firebox backhead had caused a gasket to blow.
Further progress was made on Wednesday and Friday with the stripping down of FR 20 in readiness for a boiler lift.
John Dixon released the blast pipe nuts on Wednesday.
Then on Friday the massed forces of John, Tim, Alan, Fred and Roger managed to removed the tightly fitted steel boiler cladding (or clothing as John has pointed out it was called by the LMS) and then the crinolines. This was all transferred from the RSR workshop to the FRT shed ready for cleaning and painting.
Fred also managed to find time to clean up one of FR 20’s sand pipes whilst Roger occupied himself by giving a set of Caliban’s wheels a second coat of red oxide.
John Davis gave FR 20’s tender coal space a coat of grey undercoat on Wednesday and then started the job of preparing GERs’s bogies for a repaint.
Mike Rigg has continued his work to get the fan behind the former FRT RMB counter re-fitted and working. This has entailed the fitting of fresh woodwork to support the fan and the installation of conduit and wiring. Also in his sights is the aim to get the counter lights to work again. Mike is seen here preparing the wood framework to receive the fan.
The corner posts on the FRT’s mess cabin have been painted to a shade of yellow which has met with the satisfaction of John Dixon, who was keen that they blended in with the FRT shed situated behind the cabin. Tim reckoned that we needed some canary yellow and remembered painting the FRT kayak that colour some thirty years ago. Sure enough Tim found the remainder of that undercoat and gloss paint at the back of his garage, which turned out to be enough to cover the corner posts. It just underlines the male argument that you should never throw anything away that might be useful at some time in the future!
Finally, we reported last week the sad death of member Jeff Mimnagh. We have now been informed that his funeral will take place at 1 pm on Wednesday, 26th September at All Saints Church, New Longton.
Also making a welcome improvement to the local environment has been Ed Tatham who has been working to create a garden adjacent to the children’s playground and alongside the walking route to the FRT shed. Ed is seen here lying turf which would certainly not be out of place at Wembley.
A second coat of red oxide was applied on Friday by John Davis, seen here with the paint brush.
Fred made further progress with cleaning up the components removed from FR 20, this time cleaning up and priming the engine’s vacuum pipework. Mike and Paul Newton spent more time on Friday with the delinquent extractor fan in the former FRT RMB before casting another couple of resin plates.
FR 20’s front spectacle plate was removed on Wednesday with the help of the workshop crane and John Dixon continued the process of removing both the boiler cladding and the hand rails on Friday. Fred cleaned up some of the components that had been removed on his appearance on Friday.
Tim finished painting the west side of the mess hut and it is hoped that the south end and some of the protruding east side can be painted this next week.
Work continued last week on the job of dismantling FR 20 with John and Tim spending most of their time on the job on both Wednesday and Friday. Neil came in on Saturday to clean the footplate around the reverser quadrant.
Adrian and Howard have continued their work on Caliban and Fred and Roger appeared on Friday to clean up the insides of the wheels, which had been released from under the frames the previous Wednesday.
And finally, the Friendly Engines event on the RSR over the Bank Holiday weekend was augmented by some model railways to keep visitors entertained. The weekend was deemed to be a success with visitor numbers higher than last year on all three days. Alan is seen here happily operating his three rail O gauge train set.
Alan and Tim went over to Embsay on Wednesday to examine Cumbria‘s regulator valve which was still passing large amounts of steam when supposedly shut. After much deliberation and wrestling with the valve it was concluded that there was still work to do to improve the seal between the valve faces.
Also at Embsay was Russell Walker, who appeared with daughter Chloe and an Atkinson’s low loader to take Stephen Middleton’s 1916-built Hudswell Clarke 0-6-0ST Illingworth to Preston for attention to a hot right hand driving axle box, and then a booked appearance at the RSR’s Steam Gala at the end of September.
Ade had a very productive day on Wednesday, jacking Caliban further up in the air to allow both wheelsets to be rolled out from under the frames in readiness for machining of its journals. A key milestone in the project has been achieved so congratulations, Ade!
And so to Saturday when there was an early start to enable Russell Walker to operate the crane to lift off FR 20’s chimney and dome cover before he set off for the control tower for the day. Alan, John, Tim and Sam spent the rest of the day dismantling and labelling pipework and cab fittings from FR 20 ready for cleaning and storage.
John is seen here removing excess thread from the dome studs in readiness for it to be lifted off also with the return of Russell at the end of the day.
With Howard (seen here cleaning one of Caliban’s axleboxes), David, Alison, Matthew, Derek and Neil (crewing Linda) also on site it was a good turnout of members.
FR 20 was shunted out of the RSR’s running shed last Wednesday to enable the wheels to be power washed after having been coated with Jizer degreasing fluid. Although quite a time consuming process, the results so far have been heartening. The key issue was the need to avoid soaking those members who were also intent on removing components from the loco at the same time! John Davis is seen here with the power washer.
Alan Middleton was one of those dodging the pressure washer to remove some pipework.
John Dixon spent some more time on repairs to the step boards on GER No. 5 and is seen here planing down the new wood inserts.
Fred and Tim started the process of cleaning up the components removed from the loco before they are placed in store, with Fred here cleaning one of the injector steam valve handles.
Alan returned home from a short break away the previous weekend with a set of drain cock castings and coupling rod half bearing castings for FR 25 that he had picked up from Steve Andrews.
These had been ordered by Bert Hitchen before his untimely death but we are now in a position to unite them with the loco.
Further to this, Tim paid a visit to Crewe on Thursday to pick up the two safety valves for FR 25 from L&NWR where they had been found sitting on the shelves in the store. They were certainly too heavy for the luggage rack on the train journey home!
Also last Thursday, Keith, John Dixon and Matt Gervis had a productive day fitting more rivets on Wootton Hall’s tender frames.
Headline news has been the arrival at Preston last Wednesday of FR 25’s boiler, albeit as a kit of parts. Tim received news by email of the need to move the boiler from Stockton whilst he was out of telephone contact on holiday in Cornwall. It took three journeys to the top of the local hill to get reception and organise the move, which was done with great help from Jacqueline at Northern Steam Engineering who made the arrangement for a hi-ab to transport the components as a crane could not be guaranteed to be present at Preston. In the end, the boiler was loaded a day early last Tuesday and so made an early arrival at Preston on the Wednesday morning. Fortunately, the former Furness Railway bogie bolster had already been shunted into position and the hi-ab departed back off to the north east at 10.45.
The other components were placed in the car park and will need to be moved this next Wednesday.
During the ensuing shunt moves there was a rare sight captured with FR 20, the FR bogie bolster and two boilers which have adorned ex Furness Railway locos.
Work has started on the overhaul of FR 20, with the ceremonial draining of the water from the boiler on the Wednesday the 18th July.
Last Friday Tim started the job of cleaning down the driving wheels and John Davis commenced the task of de-scaling the coal space in the tender.
Fred also took the opportunity to reprise his role as principal cleaner of FR 20’s smokebox!
John Dixon has continued to undertake woodwork repairs to the Great Eastern Royal Saloon and is seen here repairing one of the step boards.
Keith has made more progress with Wootton Hall‘s tender and has been fettling up the recently shot blasted tender hanging plates.
There has been more riveting of the tender frames and Keith is seen here pondering the next move in the restoration.
The RSR’s Sentinel 0-4-0 Enterprise, which is in the museum as part of the Sentinel display, has received a wrap depicting events over the last 50 years.
The boiler for Hunslet 0-6-0ST Glasshoughton No. 4 arrived back from Llangollen last Wednesday.
Finally, an impressive 100ft long model tram layout returned to the RSR this last weekend and Tim is seen here doing some moonlighting, driving trams in between driving the steam service yesterday!
Adrian can be seen here starting the process of applying red oxide to the cleaned up cab.
Meanwhile Alan seemed pleased with the results of the shotblasting.
Fred and Roger finished the job on Friday, but not before the cab had unfortunately been sprayed with the first rain in weeks!
The shotblasters should be returning this Wednesday to tackle the cab roof and also another cab that does not belong to the FRT.
Saturday was a little quiet (something to do with a football game!), but plenty of people, including many members and friends, came along to say “Goodbye” on Sunday. Coincidentally, Neil was able to spend his first full day on the footplate at Preston that day as he looks to regain his fireman’s ticket – at least he had a loco that he knew from times past.
Sadly, after handling the train service and rake of three coaches without fuss, FR 20 retired to the shed at the end of service on Sunday afternoon in steam for the last time for a while. As Tim put it at this point: “finish with engines”. We know from the large amount interest on the internet that everyone is willing the FRT to get the loco back in traffic as soon as feasibly possible.
John is seen here cleaning out a droplight sill prior to reassembling it. Roger has started the job of sanding down and priming parts of the buffers and couplings.
Keith has brought back some of 5643’s components from Embsay for fettling and Fred is seen here on Friday cleaning up the regulator quadrant. Keith was due to go over to Embsay on Sunday as he looks to get 5643 back in steam as quickly as possible.
In the meantime, Keith has been lining up Wootton Hall‘s tender axleboxes with the overhauled tender frames, seen here at work. A further riveting session is planned for Thursday.
Alan Ogden has once again been tackling the instruments and smaller electrical items on Fluff and is seen here with a refurbished switch box.
Ade, Alan and Howard have been hard at it in their efforts to remove the final spring hanger pin on Caliban‘s frames. Suffice to say that plan Z didn’t produce immediate results, but lots of sweat and toil were duly expended and victory was eventually achieved.
It is pleasing to be able to report that the riveting session on Wootton Hall the previous Thursday had seen approximately 50 rivets installed, and evidence of a neat job is seen in this photo of a newly riveted bracket on the front portion of the frames.
Backing plates for the tender cab steps have also been bent to shape.
And a newly fabricated and shaped plate is seen here on the frames in front of the boiler.
Alan, Tim and Pete Skellon successfully made it to the Bolton Station Community Gala on Saturday and, would you believe it, played railway songs in the bus interchange for half an hour! Must have been rail replacement songs! Both Alan and Pete had been disorganised in forgetting to take their mobile phones with them, but between you and us Alan also forgot to take a set of teeth – but we won’t tell anyone, will we?